成都地铁

  • 网络chengdu metro;chengdu subway
成都地铁成都地铁
  1. NET编程环境下成都地铁牵引仿真软件核心部分的算法及流程,并举实例验证。

    Introduce briefly the core part 's algorithm and process of Chengdu Metro Traction simulation software in VC + + . NET programming environment .

  2. 成都地铁机电系统中的RAMS管理

    Management of RAMS in Chengdu Metro

  3. 成都地铁天府广场站盾构机调头技术

    The shield machine turnaround technology in Tianfu square of Chengdu subway

  4. 成都地铁土压平衡盾构施工关键技术

    Key technologies of earth pressure balance shield in Chengdu metro construction

  5. 成都地铁2号线牛王庙车站半盖挖法设计

    Semi-covered Excavation Scheme for Niuwangmiao Station on Chengdu Metro Line 2

  6. 成都地铁试验段盾构选型探讨

    Choice of shield machine in test sect of Chengdu subway

  7. 成都地铁1号线列车微机网络控制系统

    Train Microprocessor Control and Network System on Chengdu Metro Line 1 Vehicle

  8. 成都地铁一期工程社会经济效益分析

    Analysis on the Social and Economic Benefits of the First-phase Chengdu Metro

  9. 成都地铁区间隧道盾构法可行性分析

    Feasibility Analysis of Shield Driving Method Used in Interzone Tunnel in Chengdu Metro

  10. 成都地铁车站基坑施工过程力学研究

    Study on the Mechanical Behaviors of Pit Excavation of Subway Station in Chengdu

  11. 用相对热指标确定成都地铁环控设计中的温度设计标准

    Design Temperature Criteria of Environment Control System of Chengdu Metro Set by RWI

  12. 成都地铁浅埋暗挖隧道衬砌混凝土施工技术

    The construction technology of shallow underground excavation method tunnel lining concrete in Chengdu subway

  13. 成都地铁一号线牵引仿真研究

    Study on Chengdu Metro Line 1 Traction Simulation

  14. 成都地铁环境工程地质评价

    Environment engineering geological assessment of Chengdu subway

  15. 成都地铁车站基坑支护结构受力变形研究

    Study on the Mechanical Behaviours of Retaining Structure of Excavation Pit of Subway Station in Chengdu

  16. 针对成都地铁的地质情况,重点进行了敞开式盾构机、加泥式土压盾构机以及泥水式盾构机对于成都地铁的适应性分析。

    The open shield 、 the earth pressure balanced shield and the hydro shield are mainly analyzed .

  17. 成都地铁盾构施工对周边环境的影响研究

    Study on the Influence Applied to Surrounding Environment Induced by the Construction of Tunnel of Chengdu Metro

  18. 成都地铁防水探讨

    Waterproofing in Chengdu Subway

  19. 同日,西部首条地铁线四川成都地铁一号线也正式通车试运营。

    Meanwhile , in Chengdu , Sichuan Province , western China also got its first subway line today .

  20. 成都地铁2号线将军衙门站深基坑围护结构设计

    Deep foundation pit enclosure structure design of the General Yamen station on the second line of Chengdu subway

  21. 据报道,这名小男孩的孝举是在成都地铁2号线上被拍到的。

    The child 's act of filial love was reportedly photographed inside a Chengdu Metro Line 2 train .

  22. 其次,在理论框架构建的基础上对成都地铁的外部性进行分析评价。

    Secondly , on the basis of theoretical framework , building a analysis of the external evaluation of Chengdu Metro .

  23. 最后针对成都地铁4号线的实际情况,进行了高效运营管理的对策分析。

    Finally , it analyzed the countermeasures of efficient operation management for Chengdu Metro Line 4 of the actual situation .

  24. 并对成都地铁采用地下水空调系统的意义、可行性进行了详细的分析,通过对系统的优化设计,为成都地铁可利用地下水空调系统的车站提供了最优系统参数。

    By the optimize design . this paper provides the best system parameters for the stations which have groundwater AC system .

  25. 并获得了成都地铁一号线各地铁站点的服务人口数以及站点设施规模的大小,给实际规划者和后续研究者提供了些许参考和建议。

    And received a number of subway stations serving population , giving some references and recommendations to the actual planners and subsequent researchers .

  26. 成都地铁体育馆站工程,基础埋深大,地下水丰富,技术难度大,对防水要求标准高。

    The project of Chengdu Metro Stadium Station has high standards of waterproof engineering , because of its deep base , rich groundwater and big technical difficulties .

  27. 本研究将临界埋深下的土压计算值和成都地铁工程实测值进行了比较,完成了土压力公式的选用。

    In this study , the critical depth pressure value from calculation is compared with the measured values in Chengdu Metro Project to pick the suitable earth pressure formula .

  28. 根据实际工程参数,计算了多工况下的刀盘载荷,并通过成都地铁实测数据校对了计算载荷值。

    According to the parameters got from the real projects , the loading under multi-conditions are calculated , which are also supported by the data acquired from Chengdu Metro Project .

  29. 最后结合成都地铁1号线2标段工程实例,分析了盾构施工主要施工参数如:掘进速度、注浆压力、千斤顶推力、3号应力点土仓压力和地表沉降的关系。

    Finally , analyzed main tunnelling parameters such as tunnelling velocity , grouting pressure , thrust force of the jack and the relationship between chamber pressure of the NO.3 stress point with surface settlement based on the project examples .

  30. GPS技术在成都市地铁建设中的应用

    The Application of GPS Technology in chengdu subway construction