北京地铁
- 网络Beijing Metro;subway;beijing subway
-
采用BT融资方式投资建设北京地铁奥运支线
Building Olympic Branch Line of Beijing Subway by the Investment of BT Mode Financing
-
据《中国日报》(ChinaDaily)报道,北京地铁部门正在勉力维持便民拖鞋计划。有关部门推出这一计划的初衷是帮助高峰期上下地铁时意外将鞋掉入车厢和站台缝隙中的乘客。
According to a report in the state-run China Daily , the Beijing subway authorities are struggling to maintain supplies for a temporary slipper replacement program they 've launched to help passengers who accidentally lose their flip-flops in rush-hour traffic .
-
北京地铁4号线隧道火灾烟气控制的CFD模拟
CFD Simulation on Tunnel Fire Smoke Control in Beijing Metro the 4th Line
-
浅析北京地铁奥运支线BT模式的优势和风险
On advantages and risks of BT model for Olympic branch line for metro in Beijing
-
Profibus在北京地铁5号线变电所中的应用
Application of Profibus in the Substations on Beijing Metro Line 5
-
北京地铁一号线ATS仿真系统数据库的设计
Design of ATS Simulation System of Beijing Line One Subway
-
北京地铁GTO斩波调压车微机控制装置的研制
Development of microprocessor based GTO chopper control system for Beijing metro
-
十年前,香港地铁运营商港铁公司(MTRCorporation)是北京地铁4号线的投资方之一。
A decade ago , the MTR Corporation , the Hong Kong subway operator , was an investor in Beijing 's fourth metro line .
-
用hedonic模型研究北京地铁13号线对住宅价格的效应
Research on the Effects of Metro Line 13 in Beijing on House Prices under Hedonic Model
-
周五,北京地铁禁止穿着万圣节(Halloween)服饰的乘客进站,警告称,他们可能引起恐慌和踩踏。
The Chinese capital on Friday banned Halloween costumes from its subway system , warning they could cause panic and stampedes .
-
但是,我国城市轨道交通项目应用PPP模式还处于初级阶段,如北京地铁四号线。
However , the application of PPP model in urban rail transit of China has just started , such as the Beijing Metro Line .
-
最后本文通过伦敦地铁、北京地铁四号线及英法海底隧道三个案例进行了实例分析,总结出PPP模式在准经营性基础设施项目中的经验和教训。
Finally through London Underground , Beijing Underground and European Tunnel analysis , it concludes PPP mode 's experiences and lessens in quasi-profit infrastructure .
-
周五,北京地铁禁止穿着万圣节(Halloween)服饰的乘客进站,警告称,他们可能引起“恐慌”和“踩踏”。
The Chinese capital on Friday banned Halloween costumes from its subway system , warning they could cause " panic " and " stampedes . "
-
北京地铁奥运支线工程是我国在轨道交通设施建设领域首次采用建设-转让(Build-Transfer,BT)融资方式实施的项目。
Beijing Subway Olympic Branch Line is the first project utilizing BT ( Build-Transfer ) mode financing for the rail transit construction in China .
-
随后,文章对北京地铁市郊线&大兴线曾计划使用的PPP模式的投融资方案进行了分析介绍,虽然这个方案最终没能被使用,但是从中可以找出一定的经验以及需要完善的地方。
It tried to use the PPP mode to finance . Although this program ultimately could be used , but from which we can find some experience and need to be perfected .
-
利用全球定位系统(GPS)同步地铁时钟系统,介绍了用GPS进行时间同步的原理,并结合北京地铁的实际应用介绍了GPS同步仪的设计及应用。
Synchronize the clock system through the Global Position System ( GPS ) in subway is studied , the principle of time synchronization according to the theory of GPS is introduced , and a GPS synchronizing instrument using in Beijing subway is also dealt with .
-
北京地铁施工中所采用的中洞法是以CD、CRD法为基础,继侧洞法和柱洞法(PBA工法)之后发展起来的一种开挖大型浅埋暗挖地下洞室的新工法。
Based on center diagram method and center cross diagram method , Center drift excavation method is developed as a new construction method for the large-scale shallow tunnel engineering after side drift excavation method and PBA method .
-
本文介绍了北京地铁DK9型电动客车采用两重两相斩波调压的设计特点和性能试验。
This article introduces the design feature and performance test of DK9 motor coach with two-phase-double-circuits in Beijin Underground .
-
北京地铁(十号线)苏州街暗挖车站采用PBA法施工,实现了地下大断面暗挖,并将地表沉降减小到最低限度的最终目的。
The PBA method was adopted in the construction of Suzhou Street dark-excavated station of the Beijing Subway ( Tenth Line ), which has realized the terminal target of making the large-area underground dark-excavation and reducing the subsidence to the minimum .
-
本文根据斩波调压控制的基本原理,以及北京地铁DK6,DK9斩波型动车试验和运营的研究结果,提出了城市轻轨车辆采用斩波控制的节能途径与具体措施。
Based upon the principles of chopping control and the experimental and operational results obtained from the motor cars type DK_6 and DK_9 of Beijing underground railways . proposes the way of energy-saving for chopping control of LRV and the concrete measures .
-
下图是北京地铁是线路图。
Below is a simple map of the Beijing subway system .
-
北京地铁5号线桩基静载试验研究
Static Loading Test of Piled Foundation of Beijing Metro Line 5
-
北京地铁工体站项目成本管理研究
Project Cost Management of Worker 's Gymnasium Station of Beijing Subway
-
北京地铁运营闭路电视监控系统及其应用
Closed Circuit Television Supervisory System and its application for Beijing Metro
-
国产化北京地铁列车牵引电传动系统设计
Design of Electric Drive System for Localized Metro Vehicle in Beijing
-
北京地铁13号线车站装修设计回顾
Review of the Station Decoration Design of Beijing Metro Line 13
-
非开挖技术及其在北京地铁施工建设中的应用
The application of Trenchless Technology in the subway construction of Beijing
-
北京地铁5号线下穿既有区间结构的安全评估
Security Evaluation for Beijing Metro Line No.5 to Under-traverse Line No.2
-
北京地铁浅埋暗挖新技术
New techniques of Mining Method for Shallow Tunnels in Beijing Subway
-
北京地铁新线工程地下结构防水技术