  1. 柘溪水电站扩机过程中,为保证扩机厂房东端开关站边坡稳定,采用截面积分别为2.5m×8m和4m×8m的挡土墩进行支护。

    During the expansion of Zhexi Hydropower Station , in order to support the eastern slope of the power station , a row of anti-slide piles with sectional area 2.5m × 8 m and 4 m × 8 m were applied .

  2. 数字流域水文模型在柘溪水电站洪水预报中的应用

    Application of Digital Hydrological Model to the Flood Forecast of Zhexi Hydropower Station

  3. 柘溪水电站入库洪水实时预报模型研究

    Researching of Flood Real & time Forecasting Model for Zhexi Reservoir

  4. 柘溪水电站开关站边坡变形分析

    Slope Deformation Analysis of Switch Station of Zhexi Hydropower Station

  5. 柘溪水电站建于1958年,坝高104米,系钻石形的单支墩大头坝。

    Zhexi hydroelectric station was built in 1958.It is a large dam of 104 meters in height .

  6. 柘溪水电站引水隧洞钢筋混凝土衬砌结构的可靠性分析

    Using AFS algebra and AFS structure , any human ordinary fuzzy concept can be represented . Reliability Analysis on Reinforced Concrete Lined Diversion Tunnels of Zhexi Hydroelectric Plant

  7. 柘溪水库洪水优化调度决策模型为柘溪水电站防洪决策支持系统模型库中的一个重要模型。

    The flood optimal dispatching decision model is an important one of flood decision support system models for Zhexi Hydropower Station .