概算
- financial estimates;budgetary estimate;approximate amount;rough calculation
-
[budgetary estimate] 编制预算以前,通过概略统计得出的不精确的收支数据
-
分析了大型国有企业技术改造项目超概算原因,并就如何提高投资效益提出了一些建议。
This paper probes into the cause of excess budgetary estimate of technological innovation project in large state owned enterprises . Some suggestions on how to increase investment benefit are put forward .
-
概算管理、投资管理与合同管理将联合建立投资管控信息平台,对工程建设阶段的投资额和投资进度进行分解和追踪,及时汇总投资完成情况,并进行实时分析。
Budgetary estimate , investment and contract management together will establish the investment management platform , analyze and track the investment cost , schedule during the construction stage and report the completion status of the overall investment with actual analysis .
-
VISUALBASIC+Access环境下开发信号概算软件
Developing Signal Budgeting Software in Environment of Visual Basic and Access
-
总干事应向预算、财务与行政委员会提交wto的年度概算和决算。
The Director-General shall present to the Committee on Budget , Finance and Administration the annual Budget estimate and financial statement of the WTO .
-
根据生产实际需要,作者在Turboc系统下开发了集坐标换带计算、导线网精度设计、观测成果概算及内业平差为一体的导线测量综合计算系统。
The synthetic calculation system of traverse survey , which includes coordinate transformation , precision design , field checking computation and adjustment , is developed with Turbo C language .
-
Hi&CAD中ESTI子系统在设计概算编制过程中的作用
The Utilization of ESTI of Hi-CAD Sub-system In Editing Design Estimation
-
水利水电工程设计概算标准软件(V3.0)简介
Introduction of Standard Software ( V3 . 0 ) for Design Estimate of Water Conservancy & Hydropower Engineering
-
大型火电厂基建期管理信息系统(简称基建MIS)的规划和设计,既要考虑整个系统的配置应符合概算,又要考虑今后基建MIS转换为生产MIS所带来的硬、软件要求。
When planning and designing capital construction MIS , the designer must not only make sure that the system configuration should stay within the budget , but also consider the software and hardware requirements when switching to production MIS .
-
用概率分布方法进行风险性评价,评价出凝析油的三种经济可采储量即可能储量、概算储量、证实储量分别为119.9×104t,115.4×104t,108.1×104t;
Risk assessment is carried out by applying the probability distribution method ; three economically recoverable reserves , i.
-
数据库建立后能用于指导后续工程的设计优化、概算编制、工程招标、合同结算等造价管理工作。系统采用B/S结构,以JAVA语言为开发平台。
Databases can be used to facilitate follow-up projects when established , by guiding cost management work such as design optimization , budget preparation , project bidding , contract settlement , etc. The system used the B / S structure and JAVA as the development platform .
-
接着详细讨论了造纸DCS控制系统的设计,内容包括系统工程设计、集散控制系统设计方法、DCS设计阶段要做的工作、DCS工程概算内容,最后讨论DCS系统招标书的内容。
Secondly , it talked over the design of paper DCS , including the control system project design 、 the means of designing for DCS 、 the work for designing DCS 、 the content of budgetary estimate , lastly it discussed the invite public bidding .
-
应用联合国粮农组织Wageningen法,对一系列参数进行订正后,建立起适合当地的生产潜力概算公式,经田区试验检验,证明其潜力值是可靠的和可以实现的。
After a series of parameters were corrected , a budget estimation formula for productive potentialities suitable to local conditions was established with FAO Wageningen method . It was proved in the field test that the potential value was reliable and feasible .
-
修订反映了概算为世界平均油价每桶40美元,低于每桶50美元以前用来计算预算,Bakhyt苏丹诺夫告诉国会议员。
The revision reflects an estimate for average world oil prices of $ 40 per barrel , down from the $ 50 per barrel previously used to calculate the budget , Bakhyt Sultanov told lawmakers .
-
加大改革力度不断提高设计概算质量
Strengthen Reform and Keep On Increasing Quality of Design Budget Estimate
-
在初步设计阶段要做工程概算,在施工图阶段要做预算。
Budget making must be made in construction documents design phase .
-
对完善设计概算若干具体问题的探讨
Discussing Some Concrete Questions in Perfect - ing Design Budget Estimate
-
建设概算中动态投资计算法探讨
Investigation on Calculating Method of Dynamic Investment in Construction Budget Estimate
-
政府投资项目超概算的博弈分析
Analysis of Budgetary Overrun in Public Project Based on Game Theory
-
梯田工程概算定额编制研究
A Study on Drawing up Budgetary Estimate Quota of Terraced Field
-
工业建设项目超概算问题初探
Probe into the Problem of Excess Budgetary Estimate in Industrial Construction Projects
-
工业建设项目超概算控制机制浅探
Probe into Controlling Mechanism for Excessive Financial Estimates of Industrial Construction Projects
-
地方铁路设计阶段概算编制的体会
Personal understanding of local railway estimate making in design stage
-
城市生态系统特点及对绿化概算方法的探讨
Research on the characteristics of city ecological system and afforestation budgetary method
-
主要原因是:初步设计及概算可靠;
It is because the preliminary design and cost estimate are reliable ;
-
引黄一期工程联接段内外资概算编制方法
Discussing the Method of Rough Estimate Making on Domestic and Foreign Capital
-
国外贷款港口建设项目的总概算编制
General Cost Estimation Compiling Method for Foreign-Financed Port Construction projects
-
电力工程概算审查的难点分析及对策
Difficulties and Possible Solutions to Budgetary Estimate in Power Engineering
-
提高海上石油工程项目概算质量的探究
Study on improving budget quality of offshore oil engineering project
-
智能预测土建工程概算方法的研究及其应用
The Study of Civil Engineering Budgetary Estimate and Application with Intellect Forecast
-
浅析招标工程结算超预算、概算问题
On the settlement of ultra-tender the project budget , budget issues Perspective