概算

gài suàn
  • financial estimates;budgetary estimate;approximate amount;rough calculation
概算概算
概算 [gài suàn]
  • [budgetary estimate] 编制预算以前,通过概略统计得出的不精确的收支数据

概算[gài suàn]
  1. 分析了大型国有企业技术改造项目超概算原因,并就如何提高投资效益提出了一些建议。

    This paper probes into the cause of excess budgetary estimate of technological innovation project in large state owned enterprises . Some suggestions on how to increase investment benefit are put forward .

  2. 概算管理、投资管理与合同管理将联合建立投资管控信息平台,对工程建设阶段的投资额和投资进度进行分解和追踪,及时汇总投资完成情况,并进行实时分析。

    Budgetary estimate , investment and contract management together will establish the investment management platform , analyze and track the investment cost , schedule during the construction stage and report the completion status of the overall investment with actual analysis .

  3. VISUALBASIC+Access环境下开发信号概算软件

    Developing Signal Budgeting Software in Environment of Visual Basic and Access

  4. 总干事应向预算、财务与行政委员会提交wto的年度概算和决算。

    The Director-General shall present to the Committee on Budget , Finance and Administration the annual Budget estimate and financial statement of the WTO .

  5. 根据生产实际需要,作者在Turboc系统下开发了集坐标换带计算、导线网精度设计、观测成果概算及内业平差为一体的导线测量综合计算系统。

    The synthetic calculation system of traverse survey , which includes coordinate transformation , precision design , field checking computation and adjustment , is developed with Turbo C language .

  6. Hi&CAD中ESTI子系统在设计概算编制过程中的作用

    The Utilization of ESTI of Hi-CAD Sub-system In Editing Design Estimation

  7. 水利水电工程设计概算标准软件(V3.0)简介

    Introduction of Standard Software ( V3 . 0 ) for Design Estimate of Water Conservancy & Hydropower Engineering

  8. 大型火电厂基建期管理信息系统(简称基建MIS)的规划和设计,既要考虑整个系统的配置应符合概算,又要考虑今后基建MIS转换为生产MIS所带来的硬、软件要求。

    When planning and designing capital construction MIS , the designer must not only make sure that the system configuration should stay within the budget , but also consider the software and hardware requirements when switching to production MIS .

  9. 用概率分布方法进行风险性评价,评价出凝析油的三种经济可采储量即可能储量、概算储量、证实储量分别为119.9×104t,115.4×104t,108.1×104t;

    Risk assessment is carried out by applying the probability distribution method ; three economically recoverable reserves , i.

  10. 数据库建立后能用于指导后续工程的设计优化、概算编制、工程招标、合同结算等造价管理工作。系统采用B/S结构,以JAVA语言为开发平台。

    Databases can be used to facilitate follow-up projects when established , by guiding cost management work such as design optimization , budget preparation , project bidding , contract settlement , etc. The system used the B / S structure and JAVA as the development platform .

  11. 接着详细讨论了造纸DCS控制系统的设计,内容包括系统工程设计、集散控制系统设计方法、DCS设计阶段要做的工作、DCS工程概算内容,最后讨论DCS系统招标书的内容。

    Secondly , it talked over the design of paper DCS , including the control system project design 、 the means of designing for DCS 、 the work for designing DCS 、 the content of budgetary estimate , lastly it discussed the invite public bidding .

  12. 应用联合国粮农组织Wageningen法,对一系列参数进行订正后,建立起适合当地的生产潜力概算公式,经田区试验检验,证明其潜力值是可靠的和可以实现的。

    After a series of parameters were corrected , a budget estimation formula for productive potentialities suitable to local conditions was established with FAO Wageningen method . It was proved in the field test that the potential value was reliable and feasible .

  13. 修订反映了概算为世界平均油价每桶40美元,低于每桶50美元以前用来计算预算,Bakhyt苏丹诺夫告诉国会议员。

    The revision reflects an estimate for average world oil prices of $ 40 per barrel , down from the $ 50 per barrel previously used to calculate the budget , Bakhyt Sultanov told lawmakers .

  14. 加大改革力度不断提高设计概算质量

    Strengthen Reform and Keep On Increasing Quality of Design Budget Estimate

  15. 在初步设计阶段要做工程概算,在施工图阶段要做预算。

    Budget making must be made in construction documents design phase .

  16. 对完善设计概算若干具体问题的探讨

    Discussing Some Concrete Questions in Perfect - ing Design Budget Estimate

  17. 建设概算中动态投资计算法探讨

    Investigation on Calculating Method of Dynamic Investment in Construction Budget Estimate

  18. 政府投资项目超概算的博弈分析

    Analysis of Budgetary Overrun in Public Project Based on Game Theory

  19. 梯田工程概算定额编制研究

    A Study on Drawing up Budgetary Estimate Quota of Terraced Field

  20. 工业建设项目超概算问题初探

    Probe into the Problem of Excess Budgetary Estimate in Industrial Construction Projects

  21. 工业建设项目超概算控制机制浅探

    Probe into Controlling Mechanism for Excessive Financial Estimates of Industrial Construction Projects

  22. 地方铁路设计阶段概算编制的体会

    Personal understanding of local railway estimate making in design stage

  23. 城市生态系统特点及对绿化概算方法的探讨

    Research on the characteristics of city ecological system and afforestation budgetary method

  24. 主要原因是:初步设计及概算可靠;

    It is because the preliminary design and cost estimate are reliable ;

  25. 引黄一期工程联接段内外资概算编制方法

    Discussing the Method of Rough Estimate Making on Domestic and Foreign Capital

  26. 国外贷款港口建设项目的总概算编制

    General Cost Estimation Compiling Method for Foreign-Financed Port Construction projects

  27. 电力工程概算审查的难点分析及对策

    Difficulties and Possible Solutions to Budgetary Estimate in Power Engineering

  28. 提高海上石油工程项目概算质量的探究

    Study on improving budget quality of offshore oil engineering project

  29. 智能预测土建工程概算方法的研究及其应用

    The Study of Civil Engineering Budgetary Estimate and Application with Intellect Forecast

  30. 浅析招标工程结算超预算、概算问题

    On the settlement of ultra-tender the project budget , budget issues Perspective