高墩上

高墩上高墩上
  1. 在高墩上修建V形支撑的施工方法

    Construction Methods for Building V Supports atop High Piers Shape Shadow

  2. 四个高墩的自振周期满足1959年高墩会议上对高墩自振周期的限制标准;

    The free-vibration period of four high piers can fit the limiting criterion which is established at the high-pier meeting in 1959 ;

  3. 对山区梁桥高墩的抗震概念设计进行了研究,并通过工程实例进行分析比较,提出了高烈度地震的山区,梁桥高墩在选型上应注意的一些问题。

    The conceptual design of earthquake resistance for high piers of girder bridges in mountainous district is researched in this paper , and some noticeable matters for high piers in highly seismic mountain region are put forward with analysis and comparison of an engineering example .