哈尔滨地铁
- 网络Harbin Metro
-
哈尔滨地铁设备管理用房空调通风系统设计方案比选
Selection of Air-conditioning Ventilation Design Schemes for Plant Management Rooms of Harbin Metro
-
研究结论:根据研究的结果,推荐哈尔滨地铁一期工程正线采用DC1500V架空刚性悬挂。
Research conclusions : According to the research results , the DC1500 V rigid suspension overhead catenary system is recommended for the first metro line of Haerbin .
-
GPS技术在哈尔滨市地铁一号线施工控制网中的应用
Application of GPS Technique in Establishing the Control Network of Construction for the Project of Harbin Subway Line 1
-
本文结合哈尔滨市地铁站台热环境的数值模拟结果,对以利用地铁废热为目的的地铁废热-土壤源混合式热泵机组进行了实验研究。
In this paper , combining the numerical simulation results of temperature environment of Harbin subway station , make experimental research of subway waste heat-ground source heat pump system for the utilization of subway waste heat .
-
上世纪70年代初哈尔滨市按照当时地铁限界标准修建了一条地下人防工程(即7381工程),隧道穿越粉质粘土、细砂土层,埋深10-20m。
The project 7381 was constructed in the early 1970s , which was designed according to the subway standard at that time . This tunnel runs through silty clay and thin sand layer 10 ~ 20 meters beneath the ground .