工程建设定额

工程建设定额工程建设定额
  1. 电力工程建设定额的发展趋势

    Development trend of power engineering construction ration

  2. 施工定额在工程建设定额体系中的基础作用,是由施工定额作为生产定额的基本性质决定的。

    The site construction ration plays a fundamental role in the project cost ration system .

  3. 首先解释了工程建设定额及工程造价管理的不同意义。

    In this paper , first , the difference between engineering construction quota and engineering cost was explained .

  4. 摘要针对在当今市场经济条件下电力工程建设定额的现状、存在的问题,分析电力工程建设定额在今后电力行业推行工程量清单的情况下的发展趋势。

    The current situation and existing problems of power engineering construction ration in the market-oriented economy are introduced , and the development of power engineering construction radon in the future when the engineering workload list method is implemented by the power industry is analyzed .

  5. 胜利油田工程建设监理定额的编制

    Working - out of Project Construction Supervising Quota

  6. 工程建设需要定额

    The Engineering Construction Need Quota

  7. 此方法可应用于工程项目建设工期定额的修订与完善,以及建设工期定额的执行和建设工期的决策与管理。

    This method may use in revision and perfection of quota in completion time of project , and use in the decision and management of completion time of project .

  8. 大多数业内人士和经济学者非常赞赏我国工程建设领域中的定额体系,现在最紧迫的任务是使定额中的量与价分离,使消耗量成为国家标准,使造价成为市场信息。

    Most industrial persons and economists highly appreciate the price quotation system in engineering construction fields of China . The most urgent task now is to separate the quantity from price in the quotation , let the consumption amount become the national standard and cost become the market information .

  9. 阐述工程设计阶段进行优化设计和造价控制的重要性,并对工程建设概预算定额及计价依据进行分析。

    Importance of optimization design and cost control during the design stage of a project is put forward . Project budget rating and pricing basis are also analyzed .