特殊地质
- 网络special geological conditions;special geology
-
特殊地质条件下桥梁深桩基钻孔方法的选择
Selection of Boring Method for Deep Pile Foundation under Special Geological Conditions
-
特殊地质条件下桥梁桩基的施工工艺探讨
Discussion on construction technology for bridge pile foundation at special geological conditions
-
最后对小净距隧道的适用条件和范围进行了分析,提出在特殊地质条件下应与其它隧道型式进行综合比选后采用。NET环境下用C实现Web服务的具体实例。
Finally carried on the analysis about the suitable condition and scope of the short net distance tunnel , proposed that should carry on synthesis alternative option with the other pattens tunnel before used under special geological condition .
-
混杂堆积(Mélange)②不是孤立的地质现象,它是一种在特定地质历史时期、特定地质条件下的特殊地质体。
M é lange is not an isolated geological phenomenon but a kind of specific geological body formed under particular geological conditions in a certain period .
-
根据工程的特殊地质条件,文章应用了CFG桩复合地基,并将截面设计成楔型,降低了造价,取得了较好的社会效益和经济效益。
According to the special geology of the project , this paper makes use of the compound foundation of CFG pile and design the section as wedge model , so it cuts down the cost and obtains better social and economic benefit .
-
铜陵地区现代岩溶发育深度一般在200m以内,但在特殊地质块段存在着埋藏深度更大的岩溶,它的存在对地下水资源的开采和深埋矿床的开采具有重要意义。
In Tongling area . the modern karst is formed at the depth of 200m , but still deeper karsts are hidden in special sections of the area , which are worth of notice for the mining of groundwater resources and deep-lying deposits .
-
大口径、高工压、平行双线PCCP在大型引水项目中是理想的选择,文中介绍了平行双线PCCP在特殊地质条件下的施工全过程,可供同类工程参考和借鉴。
The parallel double PCCP with large diameter and high pressure is the ideal selection in the large-scale water diversion project . In this paper , the whole construction process of parallel double PCCP in the peculiar geology condition is introduced .
-
实践说明,从定量分析的角度确定最佳因素,改善了浅层资料的质量,保护了50Hz的有效信息不受损害,提高了对特殊地质体的分辨能力,突出了大倾角反射。
It is shown from the practice that the optimum acquisition parameters determined by quantitative analysis can keep 50 Hz effective seismic wave , improve shallow data and the resolution of special geologic bodies , and enhance high dip reflec - tions .
-
浅谈特殊地质层沉井下沉的施工方法
Construction method for drilled caisson sinking subsidence in special geological stratification
-
特殊地质条件的铁路基础设计山区复杂地质条件下的基础工程
The Groundwork Design of Iron Tower on Special Geological Conditions
-
特殊地质条件下塔式起重机基础的设计
Design of Tower Crane Foundation on the Special Geological Condition
-
特殊地质条件下桥梁沉井基础施工方法的研究
Research on Construction Method of Bridge Caisson Foundation under Special Geologic Condition
-
具有特殊地质地貌的黄山风景区雷电环境分析
Analysis of Lightning Environment in Huangshan Scenic Area with Special Geological Features
-
特殊地质灾害对井筒的破坏及对策
Failure of shaft caused by special geologic hazards and corresponding prevention measures
-
推覆体下特厚煤层开采的特殊地质灾害问题
Special Geological Disaster in Mining of Extra Thick Coal Bed under Nappe
-
特殊地质条件下龙潭隧道的围岩稳定性数值研究
Numerical Study on the Stability of Longtan Long Tunnel under Problematic Geological Conditions
-
应用相干体技术研究生产矿井中的特殊地质体
Specific Geological Body Investigation in Producing Coalmine by the Use of Coherence Technique
-
广州地铁特殊地质土压平衡盾构施工方法
EPB Shield Driving through Special Strata on Guangzhou Subway
-
特殊地质条件下的大口径管道定向钻穿越施工技术
Construction Technology of Large Diameter Pipeline Crossing with Directional Drilling under Special Geological Condition
-
特殊地质条件下挖孔桩的处理方法
Treatments for Excavation Filling Pile in Special Conditions
-
锚杆支护技术在特殊地质条件下的应用
Application of Bolting Support under Special Geological Conditions
-
台湾特殊地质区水土保持工法之运用
Application of Techniques Used for soil and Water Conservation in Special Soils in Taiwan
-
特殊地质条件下桩基础质量监理初探
The Initial Research on the Quality Supervision of Stake Basis under Special Geological Condition
-
特殊地质条件下施打预制桩的问题及处理方法
Some problems and treatment methods of precast pile driving under special engineering geological conditions
-
特殊地质情况下大直径、超长钻孔灌注桩成孔工艺
Bore-Forming Technology for Large Diameter and Extra Long Bored Pile under Special Geological Conditions
-
特殊地质条件下采用孔底微差爆破技术的挖孔嵌岩桩施工
Hand excavated piling on embedded rock with short delay blasting at special geological conditions
-
露天矿山特殊地质地形条件下的岩石穿孔爆破方案优化
Optimization of drilling and blasting plan for surface mining in complex geological and topographical conditions
-
特殊地质条件下的桩基施工
Pile Foundation Construction under Special Geological Conditions
-
三峡泄洪坝段特殊地质条件下的帷幕灌浆施工
Curtain Grouting under Special Geological Condition
-
对特殊地质地段的地下涌水作好预测,并作好技术处理应对措施。
The underground water-inrush of particular geology zone should be pre-estimated and technical measures should be done .