系统研制完成后于2003年6月进入葠窝水库现场安装调试,并于2003年8月投入试运行,经过一年多的试运行,系统运行稳定,取得了大量测量数据。
The system was installed in June 2003 and was put into test run since August 2003 . During the test run more than one year , the system works stably and accurately .