technical station
- 网络技术站
-
Simulation Strategy of the Railway Technical Station Operation System
铁路技术站作业系统的仿真策略研究
-
Economical Efficiency Analysis on the Train Departure Strategy in Technical Station
技术站列车出发策略的经济性分析
-
Study on Optimization of Through Goods Train 's Linkage at Technical Station
基于实用的技术站直通列车接续方案计算方法研究
-
Improve on Examination & Determination Method for the Sorting Capacity of Technical Station
技术站改编能力查定方法的改进
-
Study on Examination & Determination Method and Data Processing System for the Through Capacity of Technical Station
技术站通过能力查定方法及数据处理系统的研究
-
The Yard-Controller Decision Making Support System in Technical Station based on Agent
基于Agent的技术站站调决策支持系统
-
The Ideas of Reforming the Grass-roots Agricultural Technical Station in Fujian
对改革福建省基层农业推广站的几点思考
-
The Advice and Thinking of Marshalling Yard Alteration of Technical Station
技术站站场改造的建议和思考
-
Study on Wagon Flow Optimizing and Planning the Technical Station of Xiang-Shi Line
襄石线车流优化及技术站点设置研究
-
Method to Find out the Interfered Turnout in Calculating Carrying Capacity of Throat at Technical Station
技术站咽喉通过能力计算中直接妨碍道岔组的确定
-
To study the optimal organization of railway transport system , the optimal organization of railway technical station should be studied firstly .
研究铁路运输系统的作业组织优化,首先应研究铁路技术站工作组织优化。
-
Railway ferry system includes port , ferry station , connecting railway line , and backward technical station .
铁路轮渡系统包括港口、轮渡站、铁路引线和后方技术作业站。
-
The heavier hump burden ( > 0 8 ) of technical station goes against fixed point mode .
技术站的驼峰负荷较大(大于08)是不利于定点模式的。
-
The Study on DSS of the Technical Station Dispatching & Rationally Utilizing Reception and Departure Siding
技术站调度决策支持系统的研究&到发线的合理使用
-
The accumulation time is an important component of car staying time in technical station . It has a great effect on determining the method of organizing wagon flow .
货车集结时间是货车在技术站上停留时间的一个重要组成部分,它对确定车流组织的方法有很大影响。
-
The plan of forming technical station train is an important component of the plan of forming freight train , which has a crucial role in the railway traffic organization .
技术站列车编组计划是货物列车编组计划的重要组成部分,在铁路车流组织过程中有着至关重要的作用。
-
On terms that the fixed operating time remains invariant , the increase of the non-resorting train proportion will exert a positive influence on the carrying capacity of technical station .
在固定作业时间不变的条件下,无调列车比提高对技术站通过能力产生正面影响。
-
Research methods : By studying documentation and taking Datong-Qinhuangdao Heavy-haul railway for example , this paper determines the working scope and rational effective length of the receiving-departure track for heavy load train in technical station .
研究方法:通过文献研究并以大秦线为例,确定重载铁路技术站到发线作业内容及合理的到发线有效长度;
-
The table analytic method involves many adjustment means based on the sufficient condition of operating technical station through train , such as compression of starting station and destination station , cutting the train traffic , separation traffic and so on .
表格分析法涉及很多基于开行直达到达站充分条件的调整手段,如压缩到发站、切割、合并和分流等等。
-
Research conclusions : The minimum total length of the receiving and departure track for 20 000-ton train in technical station is 3019.24 m , the effective lengths of the segments of the 3 middle switch are 665.24 m , 665.24 m , 665.24 m and 850 m respectively .
研究结论:接发20000t列车的技术站到发线总长度最小可以按3019.24m设置,3个腰岔的设置由前至后各段有效长分别为665.24m,665.24665.24m和850m。
-
The model and algorithm of using shunting engines for railroad technical service station
铁路技术站调机运用模型及算法
-
Standard for process design of laboratory , test cabinet and technical inspection station of non-ferrous metals mines
有色金属矿山试验室、化验室及技术检查站工艺设计标准
-
But there are some limitations for the Sugarcane Technical Extension Station to promote sugarcane technologies at present . These are as follows : ( 1 ) Individual factor ;
但县甘蔗技术推广站在发展和建设过程中也面临着一些制约因素,主要是①个体因素;
-
Development Process of Technical Administration in Station Repair for Railway Freight Cars in China
中国铁路货车站修技术管理发展过程
-
PLA Navy sets up first " equipment technical support personnel station "
海军成立首个“装备技术保障人才工作站”
-
The Basic Principles and Technical Parameters of Earth Station RF System
地球站射频系统的基本原理及技术指标
-
Study on the Countermeasures for the Technical Transformation of Pump Station Engineering
泵站工程技术改造对策研究
-
Feasibility research on the technical transformation of pump station
泵站技术改造可行性研究
-
Study on Evaluation Indexes System of Technical Level for CNG Station Purification Equipment
CNG汽车加气站净化设备技术水平评价体系研究
-
Preliminary Discussion on Technical Conditions for Hydrological Station Network Construction in Shenzhen
浅谈深圳市水文站网测站建设的技术条件