三峡
- 名the Three Gorges of the Yangtze River
- the Three Gorges (Qutang Gorge, Wu Gorge and Xiling Gorge) of the Yangtze river
-
[the Three Gorges (Qutang Gorge, Wu Gorge and Xiling Gorge) of the Yangtze river] 长江三峡的简称,即瞿塘峡、巫峡和西陵峡的合称,在长江上游,四川省奉节县白帝城与湖北省宜昌县南津关之间,长193公里
-
长江三峡的贯通与江汉盆地西缘及邻区的沉积响应
Forming of the Three Gorges of the Yangtze River and Sedimentary Response in the West Edge of Jianghan Basin and Adjacent Area
-
在此基础上通过对长江三峡的自然资源和文化资源从共生的角度进行了分类,提出了长江三峡遗产廊道的构建方案。
On the basis of the Three Gorges of the Yangtze River natural resources and cultural resources from the perspective of symbiosis undertook classified , put forward the Yangtze River Three Gorges heritage corridor construction scheme .
-
三峡工程上马以前,许多专家争论了好几年。
Many experts had argued for the Three Gorges water conservancy project for several years before its start .
-
近日,重庆三峡大学举办了"手机忍者"活动。
Recently , Chongqing Three Gorges University has held an activity named " Cell Phone Ninja " .
-
三峡工程岩石力学参数Fuzzy选择
Fuzzy Selection of Rock Mechanics Parameters for the Three-Gorge Project
-
Fuzzy坡三峡水库港口岸坡排水方案优化研究
FUZZY PO Optimization of Port Bank Slope Drainage Technique in Three Gorges Area
-
M·YBOX系统在三峡工程中的应用
Application of M.Y BOX system in TGP
-
GPS定位技术在三峡库区崩滑地质灾害监测中的试验分析
Application of GPS satellite positioning technique to monitoring of landslides in Three Gorges Dam
-
三峡重庆库区PAHs污染研究
Research on PAHs pollution of the Three Gorges Reservior in ChongQing
-
以三峡库区为例研讨了灾害预警GIS信息系统的工作原理及其建立过程和实际应用。
Taking the Changjiang Gorges reservoir area as example , it enters into the working principle , establishing process and actual application for GIS information system of geological calamity early-warning .
-
结合三峡机电安装监理MIS建设,研究三峡机电安装工程监理管理模式,建立了三峡机电安装监理组织机构。
Combining with the establishment of MIS in TOP M E equipment installation , it will do study about the model and organization chart of M E equipment installation .
-
文章以三峡工程重件码头为实例,介绍了RTK技术在水下地形测量中的应用,并得出一些经验性结论。
This paper introduces the application of RTK technique in underwater topographi survey with an example in the TGP heavy_parts wharf . Some experiential conclusion presented .
-
利用相关关系,在不同地区研究了满足实际洪水预报要求的DEM分辨率问题。本文以三峡区间和福建龙岩地区小流域为例研究满足实际洪水预报要求的DEM分辨率问题。
Using the correlation relationships , the resolution ratio of DEM that meet the requirement of flood forecasting is studied in different areas , which provides the foundation for actual application .
-
本文概述三峡工程用500kV大容量输电线路用导线的现状与发展趋势;
This paper presents the status quo and tendency of development of the conductors for the 500 kV large capacity transmission lines used in the Three Gorges Project .
-
证明运用DDA程序对三峡三期RCC围堰倾倒爆破效果的爆前预测是成功的,该方法对类似工程的爆破设计、施工和安全防护等具有积极的指导意义。
It is been proved successful that using the DDA program to forecast the Third-stage RCC cofferdams . In addition , this method has the positive guiding meaning to the similar project blasting design , construction and the safe protection , etc.
-
2003年6~12月三峡水库成库后,在三峡水库设置6个水平监测断面和2个垂直断面,每月对营养盐(NH3-N,NO2-N,NO3-N,TN,TP)进行浓度监测。
The concentration of NH_3-N , NO_2-N , NO_3-N , TN and TP were determined every month during June to December in 2003.Six horizontal monitoring sites and two vertical sites were set in Three Gorges reservoir .
-
通过在三峡大学校园沙河沿岸及沙河出口布点,在2004~2005年对校园生活污水进行了1a的监测,得出各个水质指标的时空动态变化规律。
Through the monitoring along the Shahe River and at the drainage mouths of the river , we got the campus sewage quality one time per month from 2004 to 2005 , the peper discusses the space-time dynamic change rule of the indexes .
-
三峡左岸电站厂房属坝后引水式厂房。机组为立轴混流式,单机容量700MW,总装机容量9800MW。
The Three Gorges left powerhouse located at the left dam toe is of a diversion type , has a total installed capacity of 9 800 MW and 14 vertical shaft turbines of 700 MW each .
-
三峡工程左厂11~14号坝段电站进水口是重要的永久建筑物,其压力钢管直径为124m,是目前国内最大的压力钢管。
The inlet of the hydropower station at the left No. 11 ~ 14 dam sections is an important permanent structure , the penstock diameter being 12 4 ? m , the largest in China .
-
采用该热源模型,在商用软件的基础上,进行了三峡1200t桥式起重机腹板与T形钢焊接过程的数值模拟,得到与现场测量相当吻合的结果。
Just by using string heat model and commercial software MARC , the welding process of T steel and side plate which are used in the 1200T bridge crane of Yangtze hydroelectric power station is simulated , and fairly coincidences between analysis and measurement are obtained .
-
通过对±500kV三峡-常州直流输电系统的可控硅换流阀的计算,分析了阀参数及分布参数对冲击电压分布的影响,并提出了改善电压分布的措施。
The influence of valve parameters and the value of stray capacitance on lightning impulse voltage distribution is analyzed based on calculation of the thyristor valve used for the Three Gorges - Changzhou ± 500 kV DC transmission line . Optimal measures for improvement of transient voltage distribution are recommended .
-
三峡一期围堰全长2502m,其中665m长的一段基础中的强风化带含有块球体,弱风化带上部存在断层。
The first stage cofferdam of Three Gorges Project has a length of 2502 m , of which a 665 m long section 's foundation consists of the strong-weathered zone containing large ball rock blocks and the weak-weathered zone with a fault in its upper portion .
-
重庆三峡库区生态安全研究
Study on ecological security in Three Gorges reservoir area of Chongqing
-
长江三峡库区江段沉积物的重金属污染特征
Heavy metal pollution in sediments from the Three Gorge Reservoir Area
-
三峡工程建设的主要科技难题
Major Difficult Problems in the Construction of the Three Gorges Project
-
三峡库区移民居住区人居环境建设初探&以巫山县大昌新镇移民居住区设计为例
Exploring Construction of Dwelling Environment of Immigrant Community in Three-gorges Area
-
三峡库区库岸防护工程研究
Research on Reservoir Bank Protection Works for Three Gorges Reservoir Areas
-
三峡库区农林复合生态系统的效益评价
Benefit Assessment of Agroforestry Ecosystems in the Three Gorges Reservoir Area
-
三峡库区体育旅游资源优势研究
Research of Advantages of Sports Tourism Resource in the Three Gorges
-
三峡工程与人居环境建设
The Three Gorges Project and the Construction of Human Settlement Environment