交货期
- 名delivery date;delivery time;date of delivery;time of delivery
-
而对于ETO型企业,因其生产过程中随机因素较多,这就造成其产品的生产制造过程不稳定、订单交货期滞后严重等问题。
As there are a lot of random factors in the product process of the ETO enterprises , which will bring some problems , such as the manufacturing process is instability , the date of delivery will be lagged behind , and so on .
-
对交货期或装运期的承诺;
An undertaking as to date of delivery or time of shipment ;
-
非常抱歉我们不能把交货期提前。
I 'm sorry to say that we can 't advance the time of delivery .
-
请您放心,我们交货期不会迟于4月份上半月。
We assure you that shipment will be made no later than the first half of April .
-
用遗传算法解模糊交货期下FlowShop调度问题
Flow Shop Scheduling with Fuzzy Due Dates Using Genetic Algorithm
-
基于动态瓶颈的多交货期FlowShop分解策略
A decomposition strategy for Flow-shop problem with multiple delivery time based on bottleneck
-
一种基于交货期调整的Jobshop迭代优化算法
An Iterative Algorithm for Job Shop Scheduling Based on Adjusting Due Date
-
一种基于分解交货期的Jobshop启发式调度算法
A Heuristic Method for Job Shop Scheduling Based on Decomposed Due Date
-
模糊交货期FlowShop调度文化进化算法研究
Research on cultural evolutionary algorithms applied to Flow Shop problem with fuzzy delivery time
-
研究了具有不同交货期窗口的FlowShop的提前/拖期调度问题,并考虑了处理时间的不确定性。
The Flow Shop scheduling problem with distinct due window is discussed in this paper .
-
本文研究了在处理时间不确定的条件下,带不同交货期窗口的存储时间有限型FlowShop调度问题。
The paper studies flow shop scheduling problems with finite intermediate storage with different delivery windows under uncertainty .
-
本文提出了一种以交货期调整为基础的Jobshop调度迭代优化算法。
A new iterative method for job shop scheduling based on adjusting due date to minimize total tardiness is proposed .
-
实施IE技术保证产品交货期的实践研究
Applying IE Technology Assure Product Delivery
-
关于CON交货期的一个最优问题
A Problem on Optimal CON Due - Date
-
基于JIT动态适应交货期要求的MRP优化算法
Optimized MRP Algorithm with Dynamic Adaptation for Desired Delivery Time Based on JIT
-
有交货期的Job-shop调度问题的改进的倒排算法
The Reverse Algorithm of Job-shop Scheduling Problems with Due Dates
-
此文考虑下述排序问题(P):有n个工件需在同一台机器上加工,对各工件有一共同的宽容交货期。
This paper considers the following scheduling problem ( P ): n jobs demand to be processed on the same machine and there exists a common due window for each job .
-
对模糊交货期下置换FlowShop调度问题以及禁忌搜索算法的邻域、禁忌表和搜索策略进行研究,提出一种求解该问题的禁忌搜索算法。
The fuzzy due data permutation flow shop scheduling , the neighborhood , Tabu list and searching strategy are studied . Tabu search heuristic algorithm to solve the problem is proposed .
-
本文考虑了n个工件在同一台机器上加工的调度问题,其中工件的加工时间和交货期都是具有任意分布的随机变量。
In this paper , we consider scheduling n jobs on a single machine where the job processing times and due dates are independent random variables with arbitrary distribution function .
-
MTO型供应链的价格/交货期协商支持模型
Model for Supporting the Price and Due Date Negotiation in MTO Supply Chain
-
带有交货期窗口模糊加工时间的Flow-shop调度问题
Flow-shop Scheduling Problem with Uncertain Processing Time and Distinct Due Window
-
基于损失规避的MTO企业交货期研究
Delivery Time of MTO Companies Based on Risk-averse
-
具有窗口式交货期的加工排序问题是一个强NP困难问题,传统方法的计算效果往往不能令人满意。
Machines process sequencing problem with due date windows in NP hard in the strong sense , traditional algorithms usually are not satisfied .
-
模糊交货期Flow-shop调度问题的改进微粒群算法
Improved PSO algorithm for flow shop scheduling problem with fuzzy delivery time
-
最优公共交货期决策与排序关于Lebesgue型和的最佳常数
Optimal Constant Due-Date Assignment and Sequencing On Optimal Constant of Lebesgue Function Type Sum
-
用QPSO算法求解模糊交货期Flow-shop调度问题
Quantum particle swarm optimization for flow-shop scheduling problem with fuzzy delivery time
-
静态条件下SLK交货期完工时间的离差平方和最小问题
Static problem minimizing the square deviation of job completion times under SLK due-dates
-
基于交货期的模具作业调度问题是NP问题,当问题的规模较大时,求其最优解几乎是不可能。
The mould manufacture scheduling based on due date is the NP hard problem . It is impossible to find the optimal solution when the problem 's scale is very large .
-
研究了处理时间不确定且具有不同交货期窗口Flow-shop的提前/拖期调度问题。
The Flow-shop earliness / tardiness scheduling problem with uncertain processing time and distinct due window is discussed in this paper .
-
考虑交货期满意度和实际调度中存在的不确定性,采用一种具有模糊处理时间的Jobshop调度模型来描述冷轧生产线的物流情况。
In order to improve order delivery satisfaction and address scheduling uncertainty , a fuzzy Job Shop scheduling model is established to represent the whole logistics of the cold rolling line , in which an order batch is regarded as a fundamental scheduling job .