南水北调东线工程
- 网络the eastern route of south-to-north water transfer project;south-to-north water transfer east route project
-
南水北调东线工程大型泵站设计研究
Design of large-scale pumping stations in South-to-North Water Transfer East Route Project
-
对南水北调东线工程中的调蓄枢纽东平湖进行了考察。
Hydrodynamic modeling of South-to-North Water Transfer East Route Project from Dongping Lake to Jinan City ;
-
南水北调东线工程实施后,京杭运河的正常水位比设计最高通航水位还高0.5m,对船闸的运行管理和船只通航带来一定影响。
For the influence of South-to-North Water Diversion Project to Yangzhou ship locks , the design maximum water level is higher than the normal water level of the Grand Canal , the high water head affects its ' operation , management and navigation .
-
南水北调东线工程优化调度研究
Study on Optimum Operation of the East-Route South-to-North Water Transfer Project
-
治理污染、保护环境是南水北调东线工程成功的关键
Control Pollution and Protect Environment in the South-to-North Water Transfer Project
-
自优化模拟及其在南水北调东线工程中的应用
Self-optimization simulation and its application in the Project of South-to-North Water Transfer
-
南水北调东线工程对扬州市船闸的影响及对策分析
Influences of South-to-North Water Diversion Project to Yangzhou Ship Locks and Corresponding Measures Analyse
-
南水北调东线工程水工混凝土抗拉强度的长期性能研究
Long-term Property of Tensile Strength for Hydraulic Concrete in the Eastern Route of SNWT Project
-
南水北调东线工程形成了一个水的网。
The Eastern Route of South-to-North Water Transfer Project forms a water network system actually .
-
南水北调东线工程泵站电机过载问题研究
Study on overload of electric motor in pumping stations of South-to-North Water Transfer East Route Project
-
南水北调东线工程运行的社会风险因子识别
Identification of social risk factors in operation of Eastern Route Project of South-to-North Water Diversion Project
-
南水北调东线工程蓄水系统运行风险分析
Operating Risk Analysis of the Storage Subsystem in the East Route Project of South-North Water Diversion
-
南水北调东线工程优化规划混合模拟模型研究
Mixed Simulation Model Study for the East-First Period Engineering Optimization Program of South Water to North
-
南水北调东线工程莱芜段水环境问题与对策
Water environment problems and countermeasures in Laiwu section of the Eastern Route Project of South-to-North Water Diversion
-
南水北调东线工程宁阳洸河截污导流工程方案设计
Design of Ningyang Guanghe River Pollutant Diversion of the Eastern Route of the South-to-North Water Transfer Project
-
南水北调东线工程为大型复杂梯级泵站系统。
Eastern Route of South-to-North Water Transfer Project is a large and complex step pumping station system .
-
采用三维湍流数值模拟方法对南水北调东线工程某泵站立式轴流泵装置进行了优化水力设计研究工作;
Numerical simulation for 3D turbulent flow in an axial-flow pump and the pump system is conducted .
-
山东省水资源优化配置与南水北调东线工程研究
On the Research of Water Resource Optimization Distribution of Shandong Province and the East-line South-to-North Water Transfer Project
-
层次分解法在南水北调东线工程风险因子识别中的运用储层对比中标准层自动识别方法研究
Application of hierarchic decomposition approach to identification of risk factors for East Route of South-to-North Water Transfer Project
-
东平湖是南水北调东线工程重要的调蓄水库之一。
Dongping lake is one of the most important reservoirs in the East-Line Project of South-North Water Transfer .
-
南水北调东线工程水资源水质管理的道德风险
Moral hazards of water resources and water quality management of East Route Project of South to North Water Transfer
-
信息租金抽取与南水北调东线工程水运营管理模式探析
Extraction of information rent and operation management modes for water resources of East Route of South-to-North Water Transfer Project
-
南水北调东线工程沿线湖沼湿地生态环境特征及退化分析
Features and Degradation of Eco-Environment of Lakes and Marshes along the East Route of the South-to-North Water Transfer Project
-
期权理论与南水北调东线工程水银行设想
Some considerations about " water bank " of east route of South-to-North Water Transfer project based on option theory
-
中国水管理制度变迁的研究&以南水北调东线工程水管理制度变迁为例
Study on the Institutional Change of Chinese Water Management Based on the Eastern Route of South-to-North Water Transfer Project
-
南水北调东线工程底泥污染物对水质的影响评价
Impact Assessment of Pollutants in Sediments on the Water Quality for East Route Project of South to North Water Transfer
-
南水北调东线工程的实施,从整体上改善了江苏的水环境。
South-to-North Water Transfer East Line Project puts into practice , improving the environment of water from the whole for Jiangsu Province .
-
南水北调东线工程及其调水特点对血吸虫病传播潜在影响的研究
Characteristics of engineering and diversion water and their potential effect on schistosomiasis japonica transmission in east route of South-to-North Water Diversion Project
-
南水北调东线工程泵站具有扬程低、流量大、年运行时间长等特点。
Pumping stations of the East-Route South-to-North Water Transfer Project have 3 characteristics : low lift , great discharge and long-time operation .
-
南水北调东线工程调蓄湖泊湿地环境影响评价及保护措施
EIA and Protection Measures for the Adjusting and Storing Lake Marsh of the East Route Project of South to North Water Transfer