套牢问题

  • 网络hold-ups;Hold-up Problem
套牢问题套牢问题
  1. 风险企业规避套牢问题的融资策略研究

    How venture firm to avoiding hold-up problem in financial procedure

  2. 以解决制造商为核心企业的供应链套牢问题为出发点,给出了由制造商协调的供应链这种特定结构供应链的套牢问题合约解。

    The hold-up problem in supply chain that coordinated by the manufacture was solved .

  3. 解决投资套牢问题的关系合约分析

    A Solution with Relational Contracts to the Investment Hold-up Problems

  4. 针对制造商创新投资套牢问题,提出了制造商创新投资的协调机制。

    The coordinating mechanism of a manufacturer undertaking investment in innovation is put forward .

  5. 投资套牢问题的期权契约分析

    Analysis on option contracts of investment hold-up

  6. 通过建立数学模型研究激励合作方进行最优专用性投资的契约机制设计问题,并通过契约机制设计解决了套牢问题对合作中专用性投资的影响。

    The influence of hold-up problem to the specific investment and the solution of the problem were studied also .

  7. 专用性人力资本由于其具有专用性资产的这些特性,使得其在投资过程中会产生套牢问题,阻碍了其有效的投资水平。

    Because of its special characteristics , making it have a hold-up problem during the investment process , and this also made a serious impediment to the effective level of investment .

  8. 因此,联合所有权不仅可以解决物质资本专用性问题,也是解决人力资本套牢问题的有效途经。

    Thus , joint asset ownership not only can resolve the problem of physical capital specificity , but also is an effective way to resolve the hold up problem of human capital .

  9. 信息技术外包决策的对策分析方法但是,信息技术外包的每个过程都隐藏着风险,套牢问题始终困扰公司,并阻滞信息技术外包策略传播。

    A Game Analysis Approach to IT Outsourcing Decision Problems But every step of IT outsourcing hides many kinds of risk , and hold-up puzzles users and slows the diffusion of IT Outsourcing .

  10. 当供应商从事非自私型投资时,同样的协调机制会导致供应商的投资低于供应链次优投资水平,不能协调供应商创新投资,也不能解决供应商投资套牢问题。

    The same mechanism will stimulate the supplier to implement less than the second-best investments when the supplier undertakes the cooperative innovation , so the mechanism can not coordinate the investment in innovation and the hold-up problem can not be solved . 4 .

  11. 本文研究信息技术外包套牢产生的原因,探讨保证项目效用最大并能缓解套牢问题的合同设计。

    This paper studies the cause of hold-up in IT outsourcing , and discusses the contract design , which maximize IT project ′ s performance and mitigate hold-up .