导流洞

  • 网络Diversion tunnel
导流洞导流洞
  1. 作为新增项目,1B标承担了导流洞封堵的改建和封堵工作。

    As additional project , 1B Lot includes reconstruction and plugging of diversion tunnel .

  2. 边坡最大组合坡高达420m,上游与倾倒蠕变岩体自然边坡连成一体,坡脚布置有9条大直径引水隧洞,其下与导流洞进口开挖区连成一片,形成轮廓复杂的高边坡。

    Nine big excavation water-intaking tunnels lie at its foot . It is interconnected with excavated slope of the diversion tunnel 's intake , forming a high slope with complex outline .

  3. 本研究以一个具体水电站的导流洞为参考,建立其隧洞的几何模型,并应用ANSYS软件对其开挖过程进行了数值模拟,通过不同工况下的计算结果对大型隧洞开挖方法进行了分析。

    The geometrical models of the tunnel are established . And the ANSYS software is employed to simulate the excavation process . The excavation methods of large-scale tunnels are analyzed according to the calculation results under different operating conditions .

  4. 大型水电站导流洞围岩稳定分析

    Rock stabilization analysis of diversion tunnel of a large-scale hydropower station

  5. 某水电工程导流洞施工期安全监测分析

    Security Monitoring Analysis of Division Tunnel in Hydropower Engineering During Construction

  6. 导流洞出口消能工的合理体型

    THE HOLE The rational configuration of dissipater of diversion tunnel outlet

  7. 对扩大导流洞出口断面的初步探讨

    A Preliminary Approach to Enlarged Outlet Section of a Diversion Tunnel

  8. 汾河二库导流洞封堵设计

    Block up Design of Diversion Hole in Fenhe No.2 Reservoir Dam

  9. 导流洞改建泄洪洞衔接段水力特性研究

    Research on Hydraulic Characteristics of Reconstructing Diversion Tunnel to Permanent Spillway Tunnel

  10. 小浪底工程导流洞开挖临时支护设计

    Temporary Support Design in Diversion Tunnel excavation in Xiaolangdi Project

  11. 导流洞改为旋涡式竖井溢洪道综合研究

    Study on transferring diversion tunnels into vortex type of vertical shaft spillways

  12. 水工模型试验中长导流洞的糙率修正问题

    Roughness Correction in Hydraulic Model Test for Long Diversion Tunnels

  13. 大型水电站导流洞堵头结构与稳定分析

    Structure and Stability Analysis of Diversion Tunnel Plug for Large-scale Hydropower Station

  14. 导流洞改建为跌流式竖井溢洪道的试验研究

    Experimental study of drop shaft spillway reconstructed by diversion tunnel

  15. 用风险分析法选择导流洞设计标准;

    The design standard of diversion tunnel is chosen through risk analysis .

  16. 复杂地质条件下导流洞围岩塌方处理对策

    Treatment Countermeasures for Diversion Tunnel Surrounding Rock Collapse Under Complex Geological Condition

  17. 导流洞封堵段混凝土浇筑及温控技术

    The concrete pouring and temperature control technology in plugging segment of diversion tunnel

  18. 膨胀混凝土在小浪底工程导流洞改造回填中的应用

    Application of Expansive Concrete for Transforming the Orifice Tunnels in Xiaolangdi Hydrolic Engineering

  19. 国外某工程施工导流洞爆破开挖技术方案的优化

    Optimization of blasting excavation scheme for construction diversion tunnel

  20. 新疆某水利枢纽工程导流洞边墙开裂结构有限元分析

    Finite Element Analysis of Xinjiang Certain Hydro-junction Project Diversion Tunnel Wall with Cracks

  21. 导流洞改建为孔板泄洪洞水力学问题研究

    Study on hydraulic problems of spillway tunnels with orifices reformed from diversion tunnel

  22. 安徽省霍山县白莲崖水库导流洞封堵施工技术

    Huoshan County , Anhui Province Bailian Diversion Tunnel Closure Cliff Reservoir Construction Technology

  23. 龙滩电站左岸导流洞爆破施工新技术

    New blasting and construction techniques of the left-bank diversion tunnel of Longtan Hydropower Station

  24. 永宁河四级电站导流洞塌方分析及处理

    Analysis and Treatment on Collapse of Diversion Tunnel of Yongning River Hydropower Station ⅳ

  25. 由于种种原因,导流洞封堵成为该工程最具难度的工作。

    Diversion plugging become the most difficult task in this project for various reasons .

  26. 导流洞与泄洪洞交汇区域的开挖及支护效应分析

    Analysis of Excavation and Support Effect in the Intersection Between Diversion Tunnel and Spillway Tunnel

  27. 导流洞围堰拆除爆破冲渣效果关键影响因素研究

    The Study ON the Key Influencing Factors of Diversion Tunnel Cofferdam Slag Blasting Remove Effect

  28. 百色水利枢纽导流洞封堵闸门设计

    Design of the blocking sluice gate of diversion tunnel of the Baise WR pivotal project

  29. 导流洞改作发电尾水洞过渡过程中明满流的数学模型

    A mathematical model for simulation of transient flow in tailrace tunnel transformed from diversion tunnel

  30. 导流洞衬砌台车的设计安装和曲线段改造技术

    Design and installation of lining trolley in diversion tunnel and ameliorative technique of curve segment