径流式水电站

  • 网络run-of-river hydropower station
径流式水电站径流式水电站
  1. 针对径流式水电站基本无调节能力的运行特点,提出其发电量最大优化调度模型,并采用罚函数法与自组织进化规划法相结合进行模型求解。

    In accordance with the characteristic of run-of-river hydropower station that has less regulation ability , a optimized model for economical operation of hydropower plant is proposed hereinafter , for which the solution is made by the self-organization evolutionary programming ( SEP ) combined with the penalty function concerned .

  2. 径流式水电站经济运行的自动控制

    Automatic control of the economical operation of runoff hydropower stations

  3. 径流式水电站年发电量的灰色预测

    Grey prediction model for annual energy output of a hydropower station without storage

  4. 低水头径流式水电站的优化运行

    Optimal Operation of Low-head Runoff River Hydroelectric Plants

  5. 径流式水电站应以下泄流量决定报汛段次探讨

    Discharge shall be the decisive factor of flood reporting interval for runoff hydropower plant

  6. 葛洲坝工程是建在中国长江(扬子江)上的一个大型径流式水电站,其装机容量为2715兆瓦。

    The Gezhouba Project is a large run-of-river hydropower plant with an installed capacity of2715MW .

  7. 从实用的角度提出了径流式水电站水能的计算机辅助计算方法。

    CAD method for hydropower calculation in run of river station is presented in this paper .

  8. 提出了径流式水电站安装时序容量的概念和计算方法。

    This paper introduces the concept and the method of calculating installation sequential capacity for run-of-river hydropower stations .

  9. 本文讨论了提高径流式水电站发电效益的两个方面:一是将上游水位控制在某个指定范围内,使水头得到充分利用;

    Two aspects concerning the increase of power generation benefit for runoff hydropower stations are discussed . One is to control the upstream water level within an assigned range so that the water head will be made full use of ;

  10. 径流引水式水电站冰期发电的探讨

    Study on generating electricity at runoff water diversion hydroelectric station in ice period

  11. 两并联径流式小型水电站的最佳组合

    Optimal Combination of Two Small Paralleled Run-of-river Power Plant