总价合同
- 网络lump sum contract;lump-sum contract;Drawing &Specification
-
由于钢材、水泥、砂石等主要建材价格波动很大,固定总价合同在履行中遇到了理论与实际的许多争议。
Many disputes have arisen due to wide fluctuations of the prices of steels , cements and gravels , etc. during performance of fixed lump sum contract .
-
固定总价合同的特点、风险和对策
Characteristics , Risks and Counter-risk Measures of Fixed Lump Sum Contract
-
然而,在固定总价合同下承担绝大多数风险,对于水电EPC总承包商来说是一个巨大挑战。
However , it is a great challenge for EPC contractor to take the all or most risks with the fixed price .
-
谈固定总价合同的特点和风险及防范
Discussion on the characteristics and risk and prevention of fixed price contract
-
施工方案在固定总价合同中风险控制的运用
Application of Construction Scheme to Risk Control of Fixed-total-cost Contract
-
工程量清单模式下固定总价合同的特点及风险
The characteristic and risk of fixing price contract at bill of quantities model
-
固定总价合同中应注意的问题
Some Remarkable Problems in Fixed Price Contract
-
固定总价合同潜在的不利因素和规避方法研究
Study on the potential disadvantage factors and the evading methods in fixed total price contracts
-
随着竞争的加剧,固定总价合同的应用越来越广泛。
With the competition turns more intensive in engineering market , the application of fixed price contract becomes broader .
-
目前工程承包计价方式有总价合同,单价合同,成本加酬金合同;
At present , there are three ways of project contract pricing , total price contract , unit price contract and cost plus compensation contract .
-
固定总价合同是工程施工合同的一种方式,由于它自身特点,所以要认真对待施工中可能出现的各种风险。
Fixed-total-cost contract is one of the engineering contracts , and due to its features , the possible risks in construction should be taken seriously .
-
在返工成本率指标上,竞争性投标总价合同与单价合同在0.05的显著性水平上存在显著性差异。
At the significance level of 0.05 , the mean values of the rate of cost overran is significantly different between lump sum through competitive bidding and unit price .
-
文章通过分析固定总价合同的特点,结合淮南洞山东路顶进立交桥项目对其施工方案设计在固定总价合同风险控制中的运用进行探讨。
Through the analysis of the features of fixed-total-cost contract , the thesis takes the overpass project of the East Dongshan Road of Huainan City to discuss the application of the construction scheme to the risk control of fixed-total-cost contract .
-
通过案例,对固定总价合同的特点、风险、争议类型进行分析并提出防范对策,以期承、发包双方在签订此类合同时尽可能将风险范围估计充分,从而避免纠纷的发生。
This paper , through a case , analyzes the characteristics , risks and disputes arising of fixed lump sum contract and presents counter-risk measures so that both parties of the contract assess the contract risks fully and thus prevent disputes from occurring .
-
合同的应用条件,计价应注意的事项,付款应注意的问题,分析了固定总价合同的风险分配,固定总价合同与单价合同的区别。
Then the applied conditions , some items notable in costing , and some problems in payments are introduced . Moreover , the risk allocation in fixed price contract is analyzed , and the difference between fixed price contract and unit price contract is identified .
-
通过实例,探讨了在铁路工程施工中,建设单位与施工单位就工程签订的单价合同和可调总价合同两种合同方式的情况下,在工程竣工后,工程竣工决算的编制方法。
This article discusses the making method of final statement at completion of project by elaborating on such two types of contracts as " unit price contract " and " lump sum adjustable contract " singed by the owner and the contractor during the construction of railway engineering .
-
总价承包项目常用合同条件核心条款解析
An Analysis of General Key Clauses of Terms and Conditions of a Lump Sum Contract for a Project
-
据合同条款,投标者提出的单价和总价可在执行合同过程中进行调整。
The rates and amounts entered by the tenderer shall be subject to adjustment during the performance of the contract in accordance with the provisions of the conditions of contract .