成本计划
- 网络Cost planning;Cost Plan
-
ERP的成本计划与控制原理分析
An Analysis of the Principle on Cost Planning and Controlling in ERP
-
支持多企业协作的项目成本计划与控制系统
The Cost Planning and Controlling System of Multi-Enterprise Cooperative Project
-
一种基于BOM/BOP的离散制造企业成本计划的模型
One Cost Plan Model of BOM / BOP - Oriented in Manufacturing
-
多数公司已经实施了节约成本计划,有一些公司,比如seat和yell,已就债务进行了重新协商。
Most have implemented cost-savings programmes and some , including seat and yell , have renegotiated their debt .
-
匹兹堡地区大医院UPMC本周说,作为其继续削减成本计划的一部分,将裁员500人。这次裁员基本都是在非临床人员中间进行,涉及医院网络的所有分支。
In another ominous sign , UPMC , the big Pittsburgh-based hospital system , said this week it was laying off500 employees as part of continuing cost-savings initiatives .
-
水利施工企业成本计划的编制与管理
Compilation and management on running cost plan for hydraulic construction enterprise
-
大型离散制造企业成本计划与控制体系研究
Framework of Cost Plan and Control System for Large-Scale Intermittent Manufacture
-
环境成本计划和控制的生命周期全成本法
Effective Methods of Environmental Costs Planning and Controlling LifeCycle Full Accounting
-
基于双基标准的大型离散制造成本计划模式
Cost Plan Pattern Based on Bi-Standard for Large-Scale Intermittent Manufacturing
-
我们谈到了降低成本计划的一些外围问题。
We dealt with the peripheral aspects of a cost reduction program .
-
提出降低成本计划,往往是由利润下降引起的。
Cost reduction programs are often triggered by a dip in profits .
-
协同项目成本计划与控制系统研究与实现
The Research and Implementation of Cost Planning and Controlling System for Coordination Project
-
一旦降低成本计划失去了活力,它最终就会消声匿迹。
Once a cost reduction program loses momentum , it eventually dies out .
-
面向离散制造企业的三阶段成本计划方法
A Three-Stepped Cost Plan Method for Intermittent Manufacturing Enterprise
-
成本计划与控制是现代企业管理的重要内容。
Cost planning and controlling is an important content in modern enterprise management .
-
第四章分析了战略成本计划与控制。
Chapter Four , it explains strategic cost plan and strategic cost control .
-
管理并协助相关部门实施降低成本计划。
Manage and co-ordinate with the concerned dept. to follow the cost reduction plan .
-
它可以有效地解决离散制造企业复杂的成本计划管理问题。
This method sovles the question of the complex cost management for intermittent manufacturing enterprise .
-
作者基于风险管理的方法,运用了系统论、控制论和信息论的原理,从成本计划的编制,成本计划的实施,成本计划的控制全过程进行的深入的风险管理研究。
The author base on the methods of risk management , using the theory of system .
-
而成本计划,作为成本管理的重要组成部分,其重要性也就日益突显出来。
As an important part of cost management , cost planning is more and more important .
-
利用区间数进行施工项目成本计划编制及优化
Make plan ; AUTOMORPHIC NUMBERS Compilation and Optimization of a Construction Project Cost Plan with Interval Numbers
-
离散制造企业成本计划与成本金分解计划集成控制模式研究
Research on the Integration Model of Cost Plans and Cost Funds Dividing Plans in Large Scale Discrete Enterprises
-
根据施工项目的成本计划,运用成本计划评审法和时间成本优化法对项目成本进行控制。
According to the construction cost plan , cost program evaluation and time-cost optimization are used to control the project cost .
-
研究了施工项目成本计划的制定过程,包括成本计划的内容和表达方式等。
The process of establishing the cost plan of the construction project is studied , including the contents and narration of the plan .
-
尽管他的理念令很多学生神往,但也有一些人仍然质疑他的时间或者耗费人力的低成本计划是否对于所有人来说都具备可行性。
Although many students are enchanted by his ideas , some still question if his time or labor consuming low-cost plans have feasibility for all .
-
最后在施工预算编制的基础上,进一步编制项目的成本计划,进行具体的项目成本管理执行工作。
Finally , on the base of compiling construction budget , project cost plan is further made and specific cost management work is carried on .
-
本文针对协同项目管理的特点,建立了协同项目成本计划与控制模型,并阐明了其项目成本预算与分配的核心方法,为协同项目成本管理系统的实现提供依据。
In this paper , a new cost planning and controlling model for collaborative project is proposed , and its cost budgeting and allocating methods are developed .
-
并从明确合同要求、编制成本计划、处理好工程变更等方面加强对工程成本的分析和控制。
From the clear and specific contractual requirements , the preparations of cost plans , and treat with engineering changes we strengthen the analysis and control of project cost .
-
应用演绎的方法,把项目管理理论应用在业主方建筑项目造价管理领域。决策阶段:主要应用项目成本计划的知识。
I try to apply the theory of project management in the owners side cost management in construction projects Decision-making stage : mainly applies knowledge of the project cost plan .
-
在此基础上,对协同项目成本计划与控制系统的结构、功能模型和信息模型进行了详细设计。
Based on above research , the structure , functional model , informational model and programs of coordination project cost planning and controlling system were designed and implemented in detail .