江口站

江口站江口站
  1. 江口水电站K8溶洞对拱坝基础应力影响分析

    Analysis of K8 cavern compacting to stress of arch dam foundation

  2. 江口水电站勘测、设计、科研概述

    Outline of investigation , design and research of Jiangkou hydropower station

  3. 江口水电站泄洪消能设计

    Design of flood-discharging and energy-dissipating structures of Jiangkou hydropower station

  4. 江口水电站坝址区三维渗流计算分析

    Analysis on three-dimensional FEM seepage of Jiangkou Hydroelectric Station 's dam area

  5. 江口水电站斜门槽水力特性研究

    Study on hydraulic properties of inclined gate slot for Jiangkou Hydropower Station

  6. 江口水电站地下厂房系统布置优化设计

    Optimization design of underground chamber system in Jiangkou hydropower station

  7. 重庆江口水电站拱坝坝体变形监测分析

    Analysis on the deformation monitoring data of Jiangkou arch dam

  8. 江口水电站拱坝稳定工程地质研究

    Engineering Geology Study for the Stability of Arch Dam of Jiangkou Hydropower Station

  9. 江口水电站地下厂房围岩稳定性研究

    Research on the Surrounding Rock Stability of Jiangkou Hydroelectric Power Station Underground Workshop

  10. 江口水电站拱坝设计

    Design of arch dam in Jiangkou water power station

  11. 江口水电站工程规划

    Project planning of Jiangkou hydropower station

  12. 江口水电站枢纽船闸设计

    Lock Design of Jiangkou Hydroelectric Station

  13. 江口水电站坝址区地质地形较为复杂,大小夹层分布众多。

    The geology and the topography are complex in dam site area of Jiangkou water power station .

  14. 重庆江口水电站拱坝施工期混凝土应力应变监测成果分析

    Analysis on monitoring result of concrete stress-strain during construction for arch dam of Jiangkou Hydropower Station in Chongqing

  15. 简述水利建设项目进行贷款能力测算的目的和必要性,介绍贷款能力测算在巴江口水电站中的应用。

    The author briefly introduces the purpose and necessity of calculation of loan capability for water and power project .

  16. 结合江口水电站溢流坝中孔检修闸门,进行了高水头斜门槽水力特性试验研究。

    Based on the test data of a repairing gate installed on the middle outlet of Jiangkou Hydropower Station , some researches about hydraulic properties of an inclined gate slot under high water head were conducted .

  17. 本文主要介绍了江口水电站左岸地下厂房系统布置的优化设计,主要包括安装场设计、主变开关站设计、副厂房设计、通风(出渣)洞设计等。

    The paper introduces the optimization design of underground chamber system in Jiangkou hydropower station , involving the design of erection bay , the main transformer switch station , the auxiliary plant and the draft or tapping hole .

  18. 本文以江口水电站岩锚吊车梁的设计为例,介绍了岩锚吊车梁的设计过程,对设计中各参数的选择和影响做了具体的分析,提出了设计和施工中应注意的问题。

    The paper introduces the design of rock anchor rod crane beam , analyses the selection and the influence of parameters and puts forward the question for merit attention in the design and the construction , taking the rock anchor rod crane beam of Jiangkou hydropower station as the ex-ample .