瀑布沟水电站
- 网络pubugou hydropower station
-
阐述了瀑布沟水电站土坝施工用的砾石土条筛、振动筛及长距离皮带输送机等的技术特点和布置。
The technical characters and deployment of the belt screeners , shaking screeners and long-distance belt conveyors for earth dam construction of Pubugou Hydropower Station are described .
-
为了验证瀑布沟水电站水轮机模型的水力性能,进行了模型验收试验。
The conclusion of the acceptance test is that both the behaviors of the model t.
-
瀑布沟水电站的开工建设是大渡河梯级开发的一个新的里程碑。
To construct this hydropower station is a new milestone in the cascade development of Dadu River .
-
在系统深入地研究瀑布沟水电站库首右岸深部裂缝和深溪沟水电站坝区右岸岸坡深部裂缝的地质和岩体力学环境基础上,建立深部裂缝的力学机制类型。
On the basis of systemically and thoroughly studying geology and environment foundation of the deep crack , this paper has established the formation mechanism of deep crack .
-
最后结合瀑布沟水电站实际进行了实证分析,结果表明该体系的建立具有一定的实用价值和理论意义。
At last it carries out empirical analysis in combination with a certain Hydropower station . The result indicates that the research on system of safety management has certain practical value and theory meaning .
-
本文简要介绍了瀑布沟水电站的工程情况,工程地区的环境特点,以及兴建该工程带来的主要环境影响,包括自然环境,生物环境和社会环境的影响及其评价结论。
The project description , environmental features of the site area , main environment impacts caused by the construction of the project including natural environment impact , biological environment impact and social environment impact , and the appraisals and conclusions are briefly introduced in this paper .