铜街子水电站
铜街子水电站
-
铜街子水电站C5层间错动带和断层破碎带的高压喷射冲洗
High Pressure Jet and Wash for Bedding Fault Zone in Layer C_5 and Fractured Fault Zone
-
铜街子水电站在复杂的地质条件下,对河床坝段进行了全面高压固结灌浆。
The complete high pressure consolidation grouting was carried out in dam section of riverbed of Tongjiezi project under , complicated geological conditions .