玉环电厂

  • 网络Yuhuan Power Plant
玉环电厂玉环电厂
  1. 自动电压控制系统AVC在华能玉环电厂的工程设计

    Engineering Design of AVC System In Yuhuan Power Plant

  2. 华能玉环电厂4×1000MW工程1号机组电气调试

    Electrical Test of Yuhuan Power Plant 4 × 1000MW Project Unit No . 1

  3. 概要介绍了玉环电厂1000MW超超临界机组设备概况和特点;

    The general information and features of1000MW ultra-supercritical unit of Yuhuan Power Plant are illustrated .

  4. 对华能玉环电厂1000MW超超临界汽轮发电机基础进行了振动特性的试验研究。

    An experimental investigation on a1000MW ultra-supercritical turbo-generator foundation of Yuhuan Power Plant is made .

  5. 华能玉环电厂1000MW超超临界2号机组凝汽器组合安装施工技术方案

    Technical Installation Plan for No.2 1000 MW USC Unit Condenser of Huaneng Yuhuan Power Plant

  6. 介绍了华能浙江分公司玉环电厂(华能玉环电厂)超超临界1000MW汽轮机过载补汽技术。

    The technology of additionally supplying steam at overload to ultra-supercritical 1000 MW steam turbine in Yuhuan Power Plant has been correspondingly presented .

  7. 本文根据华能玉环电厂工程合同签订文件并结合工程进展的相关资料,对玉环电厂1000MW汽轮机过载补汽技术作了相应的介绍。

    This paper illustrates the overload technology of1000MW ultra-supercritical turbine of Yuhuan Power Plant based on the contract and relevant project documents of Huaneng Yuhuan Power Plant .

  8. 华能玉环电厂在建的4台1000MW超超临界机组是国内单机容量最大、参数最高的燃煤发电机组。

    The 4 × 1 000 MW extra supercritical units in Huaneng Yuhuan Power Plant under construction are the power units with the largest capacity and highest parameters in China .

  9. 华能玉环电厂正在建设1000MW超超临界机组,该机组的建设特点是参数选择正确、系统安排科学、材料使用得当和设备配置合理。

    The 1 000 MW ultra-supercritical units are under construction in Huaneng Yuhuan Power Plant and their construction characters are of proper selection of parameters , scientific configuration of system , suitable application of material and rational arrangement of equipment .

  10. 华能玉环电厂四机一控集控室布置方案探讨

    Introduction of Huaneng Yuhuan Power Plant Central Control Room Layout Design Scheme

  11. 华能玉环电厂无刷励磁系统的调试实践和分析

    Commissioning Practice and Analysis of Huaneng Yuhuan Power Plant Brushless Exciting System

  12. 华能玉环电厂超超临界汽轮机过载补汽技术

    Technology of additionally supplying steam at overload to ultra-supercritical steam turbine in Huaneng Yuhuan Power Plant

  13. 华能玉环电厂取排水隧道施工中网格式盾构机的应用技术

    Application Technology of Grid Shield Machine for Construction of Take-in and Drainage Tunnels in Huaneng Yuhuan Power Plant

  14. 介绍了等离子点火装置的工作原理、系统结构、设备技术参数、运行方式和控制逻辑,以及该装置在华能浙江玉环电厂2号锅炉上的使用情况;

    The operation principle , system structure , technical parameters , operation mode and control logic of plasma ignition system and its application in No.

  15. 从建筑设计风格定位、动力岛建筑特色及建筑立面设计、集控室建筑材料的选用等方面对玉环电厂的建筑设计进行了介绍。

    This paper introduces the plants architectural style , architectural features of power island , building elevation design and building material selection for central control room .

  16. 以浙江华能玉环电厂干煤棚工程项目为背景,根据工程设计和实验研究的需要,对干煤棚这种建筑结构进行了风洞试验。

    The paper has been finished based on the dry-coal-shed ′ s wind tunnel experiment which is part of the project of Huaneng ′ s thermal power plant .

  17. 华能玉环电厂二期超超临界机组锅炉水冷壁小径厚壁管安装前发现焊缝存在较严重的未熔合缺陷,需进行大量检测。

    The results show that with the advantages of large inspection range and high sensitivity , the γ - ray radiography is suitable for small-diameter and thick-wall pipes .

  18. 上海外高桥第二电厂和华能玉环电厂为我国百万等级超临界机组,其锅炉启动系统也均为内置式分离系统,但在启动系统的具体选型和结构上各有其特点。

    The design features for OTSC boiler start-up system of Mitsui Babcock and start-up system selected for Yangzhou Power Plant project OTSC boiler and its operating mode are introduced .