目标成本分解

目标成本分解目标成本分解
  1. 细化目标成本分解是强化成本管理的新途径

    Detailed Target Cost Decomposition & the new way of strengthened cost management

  2. 基于目标成本分解的成本企画优化模型研究

    Research on Cost Design Optimizing Model Based on Break-downing of the Target Cost

  3. 切实有效的进行目标成本的分解和落实。

    To carry out effective target cost and the implementation of the decomposition .

  4. 文章用倒推成本法,阐述了如何根据目标进行成本分解、实施和控制,从而有效地降低了成本,促进了生产发展。

    With the method for pushing backward the cost , this article expounded how to carry out cost decomposition , implementation and control on the basis of the objective cost , thus to effectively reduce the factory cost , and promote the productivity .

  5. 第四章,施工项目目标&作业成本分解。

    Target-Activity cost break-down of construction project .

  6. 运用宏观企业的概念,拓展成本管理的范围,有助于目标成本的彻底分解和责任的彻底落实。

    We use the macro-enterprise concept to expand the scope of cost management , so it help decompose the target cost in multi-level and make the target cost to meet the activity .

  7. 设计了一个由目标成本设定、目标成本分解、目标成本达成三个阶段组成的多重循环的供应链成本控制体系实体模型。

    The system is a circulatory system and made up of three stages : cost target determination , cost target breakdown , cost target realization .

  8. 遴选了某中学综合教学楼项目成本管理的工程案例作为研究对象,从目标成本设置、目标成本分解、成本风险分析以及费用&进度控制四个方面对该项目在实施阶段的成本管理进行分析。

    We Select a middle school teaching building construction project cost management as a case study , and analyze the project cost management in the implementation phase from four aspects of the set target cost , target cost breakdown , cost risk analysis and cost - schedule control .

  9. 从目标成本的制定与优化,目标成本分解与落实,目标成本下达和执行,目标成本分析与考核等环节,建立全过程、动态的目标成本控制体系。

    From the development and optimization of target cost , decomposition and implementation of target cost , delivery and implementation of target cost , the analysis and evaluation of target cost and other aspects , the author established the whole-processed and moving system of target cost control .

  10. 在项目开始前,运用目标责任成本理论对项目主体工程目标成本进行了分解。

    The target responsibility cost control theory is used to decompose the target cost before the start of project .