莲花站

莲花站莲花站
  1. HK砂浆在莲花水电站1号引水隧洞补强加固工程中的应用

    Application of HK mortar in reinforcing the water tunnel in Lotus hydropower station

  2. 话音VSAT系统在莲花水电站计算机通信中的应用

    Application of VSAT system to the computer communication of Lianhua Hydropower Station

  3. InTouch工控软件在莲花水电站计算机监控系统中的开发与应用

    Development and application of InTouch engineering software to the computer supervisory control system of Lianhua Hydropower Station

  4. 为满足生产需要,莲花水电站经多次技术论证,采用了VSAT卫星通信方式,从而在网格状系统中解决了话音和实时数据传输问题。

    In order to meet the production needs , the VAST satellite communication mode , which solves the audio and real time data transmission problems in grid system , has been adopted in the Lianhua Hydropower Station based on many technical demonstrations and examinations .

  5. 莲花水电站建设合同管理的实践

    Practice of contract management in the construction of Lianhua Hydropower Station

  6. 莲花水电站引水系统优化设计

    Optimization design of water diversion system in Lianhua water power station

  7. 莲花水电站大坝堆石填筑的质量控制

    Quality control of rock filling of the dam in Lianhua Hydropower Station

  8. 莲花水电站大坝基础灌浆施工的质量控制

    Quality control in the grouting of dam foundation in Lianhua Hydropower Station

  9. 莲花水电站粘土心墙堆石坝设计特点

    Peculiarity of rockfill dam with clay core design at Lianhua hydropower station

  10. 莲花水电站水轮发电机安装及研究

    Installation of water turbogenerators at lotus hydraulic power station

  11. 莲花水电站调压井设计优化

    Design optimization of surge shaft in Lianhua Hydropower Station

  12. 莲花水电站水轮机座环及蜗壳的特点

    The Specialties of Spiral Case and Stay Ring of Turbine for Lianhua Power Station

  13. 线性模拟蒸散发系数在莲花水电站水情预报中的应用

    Linear simulation evapotranspiration coefficient applied to water regime forecast at Lianhua water power station

  14. 莲花水电站大坝帷幕灌浆成果浅析

    Brief analysis on the curtain grouting effectiveness of the dam of Lianhua Hydropower Station

  15. 莲花水电站4号机发电机转子组装施工工艺

    Installation technique of the runner of No 4 power generator in Lianhua Hydropower Station

  16. 莲花水电站二坝设计

    Design of second dam for Lianhua hydropower station

  17. 莲花水电站大坝渗流分析

    Analysis on the seepage in Lotus hydropower station

  18. 莲花水电站电源设计及机组自动化技术分析

    Design of Power Supply and Automation of Power Generating Sets at Lotus Hydraulic Power Station

  19. 本文将阐述地处高寒地区的莲花水电站厂房屋面采用倒置式防水新工艺成功应用情况,可供类似工程借鉴。

    It is detailed in this paper with the application case of Lotus hydropower station .

  20. 莲花水电站压力钢管消应热处理及效果分析

    Stress removal heat treatment of the penstock of Lianhua Hydropower Station and its effectiveness analysis

  21. 莲花水电站定子铁损试验及铁心发热烧红原因与处理

    The Stator Iron-Lose Test and Analysis & Treatment for Core Red-hot Problem of Lianhua Hydroelectric Power Station

  22. 莲花水电站大坝趾板基础防渗帷幕,其轴线位于弱风化岩带,为了确保灌浆质量,采用了几种方法进行了质量检测。

    The axes of the impervious curtain of toe slab foundation in Lianhua dam is located at the moderate weathering bedrock .

  23. 摘要黑龙江莲花水电站是我国在高纬度、高寒地区修建的第一座大型水电站。

    Heilongjiang Lianhua hydropower plant is the first large-scale hydropower plant that is constructed in the extremely cold area of China with high lattitude .

  24. 莲花水电站水库调度系统包括水情自动测报系统,卫星云图接收系统和自动气象观测站。

    The reservoir operation system at Lianhua water power station comprises automatic measurement report of water regime , satellite cloud chart reception system and automatic meteorological observation station .

  25. 莲花水电站二坝位于大坝左岸山体垭口处,为粘土心墙砂砾石坝。

    Its second dam locates at the hill cross over of left side bank of the first dam . It is a sandy gravel dam with clay core .

  26. 本文通过对莲花水电站大坝渗流分析,讨论了莲花大坝渗流稳定情况,探讨了高寒地区混凝土面板堆石坝的渗流特点。

    This paper discussed the seepage stability on the basis of analysis , and the seepage characteristics of concrete face rockfill dam located in the area with very cold climate .

  27. 莲花塘水文站同日出现1904年建站以来第四高水位。

    The water level at Lianhuatang hydrometric station reached the fourth highest on the same day since the establishment of the station in1904 .