三峡工程

sān xiá ɡōnɡ chénɡ
  • the Three Gorges Project
三峡工程三峡工程
  1. 关于三峡工程论证的意见和建议

    On the Three Gorges Project

  2. 在建的三峡工程对1954年型洪水可能拦洪100亿m3。

    The Three Gorges Project under construction could retain 10 billion cubic meters of flood water for the type of 1954 flood .

  3. 三峡工程上马以前,许多专家争论了好几年。

    Many experts had argued for the Three Gorges water conservancy project for several years before its start .

  4. 三峡工程岩石力学参数Fuzzy选择

    Fuzzy Selection of Rock Mechanics Parameters for the Three-Gorge Project

  5. M·YBOX系统在三峡工程中的应用

    Application of M.Y BOX system in TGP

  6. 三峡工程缆机风锚固结构ANSYS有限元分析

    FEA of the Wind Anchor of Luffing Cable Crane with ANSYS in the Three-Gorge Engineering

  7. 长江三峡工程库首区InSAR测量的初步研究

    InSAR investigation in the early stage of the Three Gorges Project on the Yangtze River

  8. 文章以三峡工程重件码头为实例,介绍了RTK技术在水下地形测量中的应用,并得出一些经验性结论。

    This paper introduces the application of RTK technique in underwater topographi survey with an example in the TGP heavy_parts wharf . Some experiential conclusion presented .

  9. DTS测温成果较好地证实了三峡工程大体积混凝土温度场变化的阶段性和规律性。

    The measured data of temperature with DTS confirms the stage variation of temperature field and its regularity of mass concrete in the Three-Gorges Project .

  10. 长江素有黄金水道之称,长江干支流通航总里程长达8万Km,三峡工程建成后,库区航道将有较大的改善,万吨级船队可直达重庆。

    The Yangtze River has been called the " golden waterway " . after the completion of the Xian Xia Project reservoir will have a larger waterway improvement , ten thousand-ton vessels can reach Chongqing .

  11. 利用类似工程爆破建立的爆破地震速度反应谱,采用ANSYS通用程序对三峡工程三期碾压混凝土围堰拆除爆破地震作用厂房坝段动力响应进行了计算。

    This paper using the blasting vibrant velocity response spectrum of the similar blasting project and the ANSYS program carried through the dynamical response calculation of power houses dam under the vibration by blasting demolishing the third period RCC cofferdam of Three Gorges Project .

  12. 本文概述三峡工程用500kV大容量输电线路用导线的现状与发展趋势;

    This paper presents the status quo and tendency of development of the conductors for the 500 kV large capacity transmission lines used in the Three Gorges Project .

  13. 三峡工程一期土石围堰全长约2500m,高度30~40m,束窄原河床约30%。

    The 1st stage earth and rockfill cofferdam of Three Gorges Project has a total length of some 2500m , with its height of 30 ~ 40m and reduced river width of some 30 % original one .

  14. 三峡工程厂房基坑开挖中,大部分坝段坝趾下游形成高达10~80m的临空陡坡,其中部分地段长大缓倾角结构面较发育,与临空面组合构成坝基潜在滑移面。

    During the power-house foundation of the Three Gorges projet , a 40 ~ 80 m high steep slope will be formed on downstream side of the damtoe rock monolith where large low dip angle joints constitute potential sliding surface of the dam foundation .

  15. 三峡工程左岸电站14台单机容量700MW水轮发电机组实行国际招标,招标文件突出了三峡机组的特殊运行要求;体现了当前该领域的先进水平;

    An international competitive bidding system was applied into the procurement of 14 sets of turbine generating units , each capacity of 700 MW , for the left hydroelectric station at the Three Gorges Project .

  16. 三峡工程左厂11~14号坝段电站进水口是重要的永久建筑物,其压力钢管直径为124m,是目前国内最大的压力钢管。

    The inlet of the hydropower station at the left No. 11 ~ 14 dam sections is an important permanent structure , the penstock diameter being 12 4 ? m , the largest in China .

  17. 三峡工程建设的主要科技难题

    Major Difficult Problems in the Construction of the Three Gorges Project

  18. 三峡工程与人居环境建设

    The Three Gorges Project and the Construction of Human Settlement Environment

  19. 三峡工程水位论证情报研究概述

    Information Research on Normal Pool Level Demonstration of Three Gorges Engineering

  20. 长江三峡工程构造应力场数值模拟

    Digital modelling of structural stress field of the Three Gorges project

  21. 三峡工程提前三期截流水文及施工风险率

    Risks in Hydrology and Construction for Third-Phase River Closure in Advance

  22. 三峡工程碾压混凝土配合比研究

    Mix Proportion Study of Roller Compacted Concrete for Three Gorges Project

  23. 论紧凑型线路技术的发展及在三峡工程中的应用

    Development of Compact Line Technic and Application in the Three-Gorges Project

  24. 三峡工程三斗坪坝址的岩石力学问题

    Rock Mechanics Tasks for Sandouping Damsite of the Three Gorge Project

  25. 三峡工程左岸非溢流坝8号坝段施工期变形规律及成因分析

    Study on deformation of the left non-overflow dam No.8 in TGP

  26. 三峡工程基础化学灌浆设计与应用探讨

    Design and Application of Chemical Grout to Three Gorges Dam Foundation

  27. 三峡工程新型同塔双回线路技术分析

    Technical Analysis on New-type Double-circuit Line Towers for Three Gorgers Engineering

  28. 长江三峡工程库区移民标界测量

    The Mark Measurement of Resettlement Area for Three Gorges Project

  29. 三峡工程船闸区地应力测量和地应力场初步分析

    Initial Analysis on Geostress Field in Lock Area of Three Gorges project

  30. 三峡工程大坝建基面弹性波检测方法

    Elastic waves measuring method on dam foundation surface of TGP