土建施工
- 网络civil construction
-
认为设备、材料、机器、人力及常驻机构调动至现场的工作已完成并且现场准备好开始土建施工后,开具金额等于总po金额的15%的发票。
15 % of the total Po amount shall be invoiced upon agreement that mobilization of the equipments , materials , machinery , manpower and the resident offices to the site has been completed and the site is ready to start civil construction .
-
气水冲洗滤池的土建施工与工艺安装
Civil Construction and process Installation of Air Water Washing Filter
-
试论基本建设项目土建施工合同中的价格调整
Price Adjustment of Civil Engineering Contract for a Capital Construction Project
-
水电站厂房土建施工过程仿真与可视化研究
Simulation and Visual Study on the Process of Hydropower House Concrete Construction
-
低合金钢管在土建施工中的适应性试验研究
Experimental Research on Adaptability of Low-alloyed Steel Tube in Construction
-
电厂主厂房土建施工的几个问题
Problems in Civil Engineering Construction of Power Plant Main Building
-
审核和审批土建施工单位的施工计划、施工方案。
Review and approve construction schedule and method statement by the contractor .
-
妈湾电厂土建施工计划管理我国商贸物流配送体系存在的问题及建设思路
Existing Problem and Construction Plan on Distribution System of Business Logistics in China
-
浅谈炼钢厂连铸坑改造的土建施工
Discussion on land construction of reconstruction of continuous casting pit in steelmaking factory
-
下列章节将概述土建施工活动的详情。
The section below will outline the specifics of the civil construction activities .
-
地质病害在土建施工中是经常发生的。
Geological diseases often occur in the civil construction .
-
地铁工程土建施工第三方监测
Third party monitoring in subway project civil construction
-
上海信息枢纽大楼土建施工技术
The Constructional Techniques of Shanghai Information Pivot Mansion
-
土建施工图预算的审查方法
Auditing Methods for Civil Construction Budget
-
第三方监测中的地下工程土建施工关键技术问题研究
The key technical problems in construction of the third-party monitoring in the construction of underground works
-
土建施工和系统施工将采用设计曾采用的五段工作分解结构。
Civil and systems construction will use the same five-segment work breakdown structure used by design .
-
风电场的土建施工主要包括发电机的设备基础和风机变压器基础施工。
Wind power farm civil construction consists of generator foundation and wind turbine transformer foundation constructions .
-
协调设计方解决土建施工技术问题。谈高层建筑工程结构的专业协调设计
Coordinate the Design Institute to answer field questions and resolve construction issues . High-rise Building Structural Design
-
对大型冶金企业建造电子轨道衡的型号选择、土建施工及检定几个方面进行了分析。
The type selection , construction and check of electronic track weigher in large metallurgical business are analyzed .
-
广州地铁五号线某基坑土建施工第三方水平位移监测
The Third Party 's Horizontal Displacement Monitoring for Construction of Some Foundation Pit in Guangzhou Subway # 5 Line
-
加强电气安装与土建施工的相互配合,对整个工程施工是非常重要的。
Therefore the coordination of electric erection and civil engineering construction is key to the construction of the whole project .
-
可不为人所知的是,实际上房屋在土建施工过程就存在着污染隐患。
It is not known , and indeed the process of housing construction in the LBAC on pollution problems exist .
-
工程内容:土建施工、结构、装、验、程施工及采购管理。
Content of Construction : CIvil work , Steel Structure Work , Installation Work , Commissioning , Construction and Purchase Management .
-
介绍了上海国际会议中心的工程特点及土建施工中所采取的施工技术措施。
The several features of Shanghai International Congress Center project and technical measures to be taken in its construction are introduced .
-
但是,我国隧道土建施工安全风险管理研究还相对落后,为国家的基础设施建设制造了不少麻烦。
However , our tunnel construction is in relatively backward situation , which makes a lot of trouble for the national infrastructure construction .
-
内容写得很详细,对于我这个不懂土建施工的很有参考意义,谢谢!
Content to write very detailed , for me , do not know a lot of reference value civil construction , thank you !
-
石堤水电站碾压混凝土重力坝温控仿真分析水电站厂房土建施工过程仿真与可视化研究
Temperature Control and Imitate of RCC Gravity Dam of Shidi Hydropower Station ; Simulation and Visual Study on the Process of Hydropower House Concrete Construction
-
从土建施工、管器安装、工程设计等方面分析了民用建筑卫生间刚性防水渗漏发生的原因。
The article analyses the causes of rigidity Waterproofing leakage from the civil construction , pipe - fixing and project design in toilet of the civil building .
-
施工员是建筑行业的基础岗位,各大建筑公司都需要大量的土建施工人员,其重要性毋庸置疑。
Construction workers in the construction industry based jobs , the major construction companies need a lot of civil construction workers , and its importance is beyond doubt .
-
上述三个施工管理区域将分别任命三名土建施工经理,经土建工程副总监-土建系统安装经理上报系统整合副总监。
These three construction management areas will be assigned to three civil construction managers reporting to the deputy director-civils systems installation managers reporting to the deputy director-systems integration .