迎峰度夏
迎峰度夏
-
电网迎峰度夏(冬)期间电力需求侧管理的研究
Study on Electric Power Demand Side Management to Tide Over the Peak-load during Summer / Winter Period
-
用电量的迅速增长引发了线路输送容量扩容的问题,这在经济发达地区的迎峰度夏输电运行工作中尤为突出。
To add increments of capacity for transmission line is a problem when the electricity consumption increases rapidly , which is serious especially during peak load of summer in economic developed area .
-
针对电气化铁路变电所功率因数低,不能满足剧烈变化的牵引负荷对无功补偿要求的现状。2003年迎峰度夏有序用电工作对策
The power factor for the railway substation of the electrified railway is low and can not meet the conditions of severe tractive load to reactive compensation requirements . Countermeasures Against The 2003 Peak Load to Orderly Utilize Power in The Summer