主井

zhǔ jǐnɡ
  • main shaft
主井主井
  1. PLC在主井底装载系统中的应用

    Application of PLC to Loading System for the Bottom of Main Shaft

  2. PLC全数字变频器在主井提升电控系统中的应用

    Application of PLC and Full-Digital Controller to Electrical Control System for Main Shaft Hoist

  3. 基于PLC控制的主井装载系统技术改造

    Technical Transformation In Control System of Mine Hoist Based on PLC

  4. 作者根据煤矿生产实际设计了由工业控制计算机和可编程控制器(PLC)组成的主井定重装卸载控制系统,实现了装卸载和井筒信号的自动化控制。

    The loading and unloading according to weight control system which is realized by adopting industrial computer and PLC is designed .

  5. 西门子称重元件应用于煤矿主井提升系统与PLC配合实现装载自动定量控制和原煤产量的计量。

    Load cell of SIEMENS using in coal mine main well coveying system cooperate to PLC , realizes automatic quantitative loading control and coal yield measure .

  6. CST可控软启动系统在主井带式输送机中的应用

    Application of CST Controllable S of t Start System in the Belt - conveyer of the Main Shaft

  7. 介绍BCD定量板式输送机首次在主井装载硐室的应用情况,并提出合理的改造方案,说明其应用效果。

    It explains the application of BCD apron quantitive conveyor in the loading station of the main shaft , and proposes a reasonable transform methods , states its applied efficiency .

  8. 着重介绍了CST可控软启动系统的原理、特点、优点及其在主井带式输送机中的应用情况。

    This paper emphatically introduces the principles , features and advantages of CST controllable soft start system , and expounds the application of CST controllable soft start system in the belt-conveyer of the main shaft .

  9. 新桥矿主井冲积层厚度为392m,冻结深度为602m,为同期冻结最深的井筒。

    Alluviation layer thickness in XinQiao primary well is 392 meters , the freezing depth is 602 meters , this is the deepest well in the same time of freezes chamber .

  10. 主井箕斗自动定重装载系统的改造

    Renovation of Automatic Weight-fixed Loading System for Main Shaft 's Skip

  11. 核子计量控制在主井定量装载系统的应用

    Application of nuclear measuring and controlling in main_shaft quantitative loading system

  12. 竖井主井提升机运行方式的改进

    The improvement of hoister operation manner of vertical shaft main shaft

  13. 主井提升系统定重装载改造

    Transform of weight loading of lift system in the main well

  14. 煤矿主井直流提升机电控系统自动化与信息化

    Automation and Information of Main Coal Mine Well Hoist Control System

  15. 唐口煤矿主井井筒淋水的治理

    The Harness to Spray of Main Shaft in Coal Pit

  16. 浅谈主井井架强度测试

    Elementary Introducting Testing of the Intensity of Main Well Headframe

  17. 煤矿主井井架动力特性测试与分析

    Test and Analysis on Dynamic Characteristics of the Main Headframe in Mine

  18. 主井提升系统箕斗装载信号智能鉴别

    Intellectual Distinguish of Skip Loading Signal in Hoisting System of Main Shaft

  19. 主井矿石称重装置的原理和应用

    Principle and application of weighing device used in main shaft

  20. 首山一矿主井箕斗装载硐室施工技术

    Skip-loading Room Construction of Main Shaft in Shoushan 1 ~ # Mine

  21. 山东岱庄生建煤矿主井井架强度检验

    The Intensity Testing of Main Well Headframe in Dai Zhuang Mine Shangdong

  22. 方山矿主井断绳事故分析

    Analysis on Winding Rope Broken Accident in Main Shaft of Fangshan Mine

  23. 基于γ射线的煤矿主井提升箕斗卸载检测系统

    Detection System for Coal Mine Hoist Skip Unloading Based on γ Ray

  24. 主井定容自动装载设备控制系统设计

    Control system of main - shaft fixed auto loading equipment

  25. 主井箕斗装卸载电气自动控制系统

    Loading and unloading electric autocontrol system of the skip in main shaft

  26. 主井装载计量仓闸门开闭机构非井筒侧设置

    Open-shut mechanism of the flash-locks on loading batching bin installed the non-shaft

  27. 主井提升及运输系统的技术改造

    Technology Reform of Hoisting and Transport Systems of Main Shaft

  28. 庞庄矿副井改主井时箕斗装载硐室和煤仓的施工方法

    Construction method of skip loading chamber and coal bin under rebuild from

  29. 张北煤矿主井表土层冻结施工技术经验

    Construction Experience of Main Well Topsoil Layer Congelation in Zhangbei Coal Mine

  30. 煤矿主井绞车速度监测与制动电路的设计

    New design of speed monitor and brake circuit for primary mine hoist