优先矩阵

  • 网络prioritization matrix;Priority Matrix;precedence matrix
优先矩阵优先矩阵
  1. 建立了任务组与设计组的评价机制,并提出基于优先矩阵的任务分配方法。

    Established the assessment system for the task group and designer group , and based on this , dispatched the tasks by precedence matrix .

  2. Petri网和优先矩阵在项目管理中的应用

    Application of Petri Nets and P_matrix for Project Management

  3. 本文提出描述C语言表达式的文法,并由该文法生成算符优先矩阵和算符优先函数,讨论了C语言表达式的特点和语法分析过程。

    It is reported in this paper the grammar of the expressions in " C ", and according to this , the operator precedence function is given . The characteristics and analysis of the expressions in " C " are also discussed here .

  4. 优先矩阵明确地表达了网中变迁的优先关系,为项目管理者分析项目管理中项目活动的优先关联关系提供了简便的方法。

    Because the P_Matrix can clearly express the precedence relations of transitions in a PN , so it will be a convenient way to help Project managers analyzing the precedence relations of activities in a project .

  5. 其后,给出一种由作战目标导向的制定军事欺骗计划的模型,采用“力量优先矩阵”和“协调矩阵”等方法解决了上述冲突问题,并对军事欺骗手段进行优化配置。

    Then , an operational objective-leading model for MD planning is given , of which , the above conflicts are eliminated by means of priority of effort matrix and synchronization matrix , and MD capabilities distribution is optimized .

  6. 阐述了自适应队结构的一般性概念,并以空中阻击计划为例,讨论了C2队的自适应模式、冗余结构、递补优先关联矩阵和队结构模式的Petri网分析方法

    The adaptive structure issue of C2 team is presented . Taking Air Interdiction Planning as an example , the adaptive modes of C2 team , redundancy structure , the priority assignment matrix and the analysis method are discussed for team structure modes with Petri nets

  7. 采用游客满意度测量方法中的IPA分析法,通过问卷调查或者深度访谈的方式进行调查,建立游客满意度优先改进矩阵,针对不同象限提出相应的改进策略。

    It advocates to adopt the IPA analysis method of tourist satisfaction measurement so as to evaluate the effect of experiencing design . It investigates through questionnaires or interviews and establishes the visitor satisfaction matrix . Then it puts forward improvement strategies according to different quadrants .

  8. 渐进扩展的优先关系矩阵

    Precedence Relation Matrix of Increasing Expansion

  9. 算法只要求通过计算确定每两个任务间的最优顺序,并构成一个优先关联矩阵。

    This algorithm requires only the determination of the optimum order between each two tasks by calculation and establishes a Priority Relation Matrix .

  10. 然后在构造模糊优先关系矩阵的基础上计算备选路径的优先度,由此得到路径被选择的可能性。

    Based on the fuzzy priority relation array , priority values of the choice paths are computed , and the choice possibilities of paths can be obtained .

  11. 为了克服勘探基地选择中的盲目性,本文提出了一种根据海明距离建立的模糊相似优先比矩阵的方法,该法可较科学地确定选择勘探基地的优先顺序。

    In order to prevent the blindness in exploration target selection , the paper introduces a method to establish fuzzy similarity priority ratio matrix by Hamming distance . The method can determine the priority sequence of selected exploration targets .

  12. 采用了基于优先关系矩阵的干涉推理方法检验装配序列的可行性,并计算装配序列中可能产生的装配干涉数目,最后用实例验证了所提模型的有效性。

    An inference method based on the assembly precedence relation matrix is adopted to verify the feasibility of the assembly sequence and the assembly intervene numbers in an assembly sequence are yielded . At last , the validity of proposed model is verified .

  13. 然后,根据属性间的优先顺序变换矩阵,按照优化的矩阵整体规划需求定制系统。

    Then , the DSM is transformed according to the priority order of product properties , in order to totally plan the customization system .

  14. 提出了使用特征关系图和特征高度描述待加工特征之间加工的优先顺序、采用工步优先关系矩阵校验工步序列合理性的方法。

    The key problems under discussion were to find effective sequencing constraints , which included feature relationship graph , feature height , and operation precedence matrix .