双曲拱坝

  • 网络double-curvature arch dam;double curvature arch dam;double curvature dam
双曲拱坝双曲拱坝
  1. 根据拱坝体形的几何特征,基于ANSYS软件的参数化设计语言(APDL),采用零阶近似优化法进行了单圆心等厚度双曲拱坝的优化设计。

    Based on the geometrical characteristics of arch dam ′ s shape and the APDL ( Parameter Design Language ) of ANSYS software , an optimal design for a double-curvature arch dam with a single circle center and equal thickness by using the sub-problem approximation optimal method is performed .

  2. 砌石双曲拱坝坝体应力的研究

    Research on the Body Stresses of a Stone Masonry Double-curvature Arch Dam

  3. 基于AutoCAD与ANSYS建立双曲拱坝三维计算模型方法分析

    Three-dimensional Calculation Method Research of the Establishment of Vaulted Dam Based on AutoCAD and ANSYS Software

  4. 本论文计算分析了某一碾压混凝土双曲拱坝的两种体型的应力及稳定问题,运用ANSYS软件进行计算。

    This paper presents two shapes of one roller compacted concrete hyperbolic arch dam , stresses and stabilities were analyzed by employing ANSYS software .

  5. 锦屏双曲拱坝设计坝高305m,其坝址河谷呈V形,有良好的建坝条件。

    Jinping arch dam is designed for 305m height . The V shaped river valley is favorable for arch dam building .

  6. 抛物线双曲拱坝CADC软件系统的研制

    Development of Computer Aided Design and Construction System of Parabolic Dome Dams

  7. 圆弧双曲拱坝CADC系统的分析与总体设计

    Analysis and the overall design of CADC system for circular double curvature arch dam

  8. 该工程大坝为混凝土双曲拱坝,最大坝高305m,为目前世界上最高拱坝。

    The project adopts a 305 m concrete hyperbolic arch dam which is the highest arch dam in the world .

  9. CASIO-4800计算器编程在双曲拱坝施工测量中的应用

    Application of the Program by the CASIO-4800 Calculator into the Construction Measuring for the Double Curve Arch Dam

  10. 阳明山水电站拦河坝采用C15细石混凝土砌石双曲拱坝,坝顶表孔泄洪,挑流消能。

    Yangmingsha Hydropower station dam is a C15 small size aggregate concrete stone masonry double curvature arch dam with crest spillway and flip buckets for energy dissipation .

  11. 拉西瓦混凝土双曲拱坝的横缝采用JBJ-60型单向注浆器在原有塑料拔管系统的基础上进行重复灌浆。

    The transverse joints of Laxiwa arch dam use JBJ-60 one-way grouting device to conduct the repeated grouting in the original plastic pipe .

  12. 通过三维有限元瞬态温度场仿真分析,得到了某100m级薄碾压混凝土双曲拱坝从施工到运行全过程温度场变化规律,为该工程的温控措施设计和控制温度应力提供了依据。

    By 3D FEM transient simulation analysis of temperature field , the law of temperature field change of the arch dam in the whole process from construction to operation is found out , providing basis for design of temperature control and control of temperature stress in this project .

  13. 双曲拱坝分析的研究

    Study on the method of analysis for double curvature arch dam

  14. 双曲拱坝的优化及可视化语言的应用

    The optimization of double-curved arch dams and application of visual language

  15. 非对称河谷双曲拱坝的特点

    Features of Double - Curvature Arch Dam on an Unsymmetrical Valley

  16. 洞坪工程双曲拱坝混凝土施工技术

    Construction Technologies for Double - cuved Arch Dam of Dongping Hydroproject

  17. 江口双曲拱坝整体稳定地质力学模型试验研究

    Geomechanical Model Stability Test for Jiangkou Double - Curved Arch Dam

  18. 双曲拱坝施工放样软件开发技术

    Techniques of the Software Development of Construction Lofting of the Dom Dams

  19. 高混凝土双曲拱坝温控费用研究

    On High Concrete Double Curvature Arch Dam Temperature Control Costs

  20. 欧阳海双曲拱坝大孔口应力观测成果分析

    Observation Data Analysis of Hole Stress in a Dome Dam

  21. 峡口水利水电枢纽工程双曲拱坝优化设计

    Optimization Design of Double-Curved Arch Dam in Xiakou Hydraulic Project

  22. 抛物线双曲拱坝有限元网格剖分与计算

    Division and Calculation of Finite Element Network for Parabolic Double-curved Arch Dam

  23. 双曲拱坝优化设计中的几个问题

    Some Problems in the Optimum Design of Double-Curved Arch Dams

  24. 广东省首例砌石双曲拱坝建设的回顾《广东省灌溉试验新技术培训班》在我所举办

    Review of the First Concrete Masonry Double-Curvature Arch Dam Construction in Guangdong Province

  25. 洞坪双曲拱坝三维渗流及坝肩稳定分析

    Analysis on 3D Seepage Field & Abutment Stability of Dongping Double-curved Arch Dam

  26. 初论抛物线双曲拱坝的体形选择

    Trial Discussion on Type Selection of Parabolic Arch Dam

  27. 双曲拱坝的最优化设计

    The optimum design of double - curved arch dams

  28. 抛物线双曲拱坝计算

    An Algorithm for Arch Dams of Parabola Double Curvature

  29. 混凝土双曲拱坝体型施工控制的技术体系

    Study on Control Technology for Hyperbolic Arch Dam Construction

  30. 某双曲拱坝应力稳定分析

    Stress and stability analysis of one hyperbolic arch dam