  1. 坝轴线全长586.3m。

    The axial line of dam is 586.3m long in total .

  2. 大坝为沥青心墙堆石坝,大坝坝顶高程2654.5m,坝轴线长411m,最大坝高125.5m,坝顶宽度14m。

    The rock-fill dam use the asphalt concrete core , with the maximum height of 125.5m and the dam crest length of 411m . The normal storage level is 2650m .

  3. 浆砌石双曲拱坝的测量方法&标定坝轴线的测量方法

    On Surveying Methods For Calibrating Dam Axis of Double-curvature Arch Dam of Stone Masonary

  4. 在坝轴线附近隐伏大规模溶洞的可能性较小;

    The potential for large cave development near the dam axis is very small ;

  5. 折线型坝轴线及高陡河谷边坡对面板堆石坝应力和变形的影响

    The Influence of Fold Line Dam Axis and High Steep River Valley Slope on the Stress Distribution and Deformation of Concrete-Face Rockfill Dam

  6. 介绍溢流面板堆石坝的经济性、坝址、坝轴线选择和设计中应注意的事项。

    This paper presents the natural and socioeconomic characteristics considered in site selection and axis design of the overflow rock fill dam with concrete facing .

  7. 从顺河、铅直和坝轴线3个不同的方向输入不同频率的简谐波,其幅频反应:顺河向激振,位移反应最大;

    The simple harmonic waves with different frequencies have been input in three directions of parallel and vertical to the river and along the dam axis .

  8. 继而,还提出了关于坝轴线布置、坝基开挖、洞室围岩稳定及支护、边坡开挖等方面的看法。

    It puts forward some suggestions on the layout of dam axis , dam foundation excavation , the stability and supporting of the surrounding rocks of cavities and the slope excavation .

  9. 由于平原水库围坝轴线较长、地质条件较差、筑坝土料较差等特点,防渗处理是平原水库建设的关键问题。

    As plain reservoir dam axis Wai longer , poor geological conditions , poor soil material for dam characteristics such as anti-seepage treatment is the key issue of plain reservoir construction .

  10. 从右至左右葛洲坝、西坝两个江心洲,把长江分割为大江、二江、三江,工程因坝轴线横穿江心的葛洲坝而得名。

    Right to about Gezhouba Dam , the river Xiba two continents , divided into the Yangtze River , the River , Sanjiang , the works of the dam axis across the river named after the Gezhouba Dam .

  11. 由于水压力荷载的作用,水平位移的分布有较明显的变化,坝轴线上游部分坝体指向上游方向的位移有所减少,指向下游方向的位移有所增加。

    Because water pressure load , The horizontal displacement distribution have more apparent change . The dam upstream dam axis part to the direction of the upstream displacement reduced , pointing to the direction of the downstream displacement has increased .

  12. 本文的前部分,给出一个求解平板支墩坝中的支墩&横撑体系沿坝轴线方向振动基频的近似计算方法。

    The first part of the paper deals with an approximate method for Calculating the fundamental frequency of buttress-braces system in the slab and buttress dam vibrating in the direction of dam axis .

  13. 由于影响坝坡抗震稳定的主要因素是加速度放大倍数,所以不能忽略铅直向和坝轴线向的地震波输入。

    The amplifying times of acceleration is the key factor of influencing the seismic stability of dam slope so that it should not be neglected for those earthquake waves from the vertical and dam axis directions .