天桥水电站采用面流消能,原设计洪水标准为100A一遇。
Surface flow energy dissipation has been applied in tianqiao hydro - power station with original design of flood Standard of once a hundred years .
-
天桥水电站经济运行系统的开发与应用
Exploration and applying of economy circulation system in Tianqiao hydropower station
-
天桥水电站围堰水下混凝土的施工
Subaqueous Concreting in Cofferdam Construction of Tianqiao Hydroelectric Station
-
天桥水电站新增泄水建筑物布置型式研究
Study on the layout pattern of new spillway structure of Tianqiao hydropower station
-
黄河天桥水电站工程建设及泥沙处理主要经验
Main Experiences of Project Construction and Sediment Treatment at Tianqiao Hydroelectric Station of Yellow River
-
天桥水电站泄洪洞工作闸门启闭力原型观测成果分析
Analysis on prototype observation on lifting power of spillway tunnel working gate for Tianqiao Hydropower Station
-
黄河天桥水电站水库冲淤特性分析
Analysis of particularities of scouring and silting in reservoir of Tianqiao Hydropower Station on the Yellow River
-
黄河天桥水电站面流消能问题探讨
Study of Issue of Surface Flow Energy Dissipation in Tianqiao Hydro - Power Station in the Yellow River
-
为了解决天桥水电站双层泄洪闸下游的面流消能衔接及流态转化问题,利用除险加固新增泄水建筑物提高了枢纽的泄洪能力。
The submerged bucket dissipation and flow pattern transformation that lie in the downstream of double sluice dates of Tianqiao power station are deeply analyzed .
-
研究表明,天桥水电站采用该软件实行经济运行可增发电能,提高水电站的发电效益。
The study has proved that Tianqiao hydropower station uses this software to implement economical operation that it can add generated electricity , economize consumed water , increase dynamoelectric benefit .