  2. 龙滩水电工程左岸B区边坡压脚工程效果分析

    Effect of pressing foot project on the left bank slope of Longtan Hydropower Station

  3. 某水电站左岸B(20)崩塌堆积体稳定性研究

    Stability study on falling accumulation B_ ( 20 ) on left bank of hydropower station

  4. 龙滩水电站左岸蠕变体B区边坡位移监测分析

    Deformation monitoring analysis in the creeping rock slope B on the left bank of Longtan Hydropower Station

  5. 龙滩水电工程左岸蠕变体B区边坡的变形和稳定是工程安全的关键。

    The deformation and stability of left bank slope B in Longtan Project is the key to safety of the project .

  6. 某水电站左岸深裂缝对工程荷载下边坡稳定性影响的FLAC~(3D)分析

    Studies on influence of deep cracks on slope stability on Left Bank of a hydropower station by FLAC 3D

  7. 集团军部的命令是从被打开得突破口里继续向Order发起进攻。夺取河左岸的一个桥头堡。

    The brigade and army 's orders were to enter the breakthrough and continuing the offensive toward Order , capture a bridgehead on the river 's left bank .

  8. 该区主要构造迹象表现为断层和节理,其中F1、F3规模最大,以F1断层及F3断层为界,可以将糯扎渡左岸分为三个大的工程地质区。

    The region presented faults and joints , where scales of F_1 and F_3 are the largest .

  9. 锦屏一级水电站左岸V山梁岩墙边坡稳定性评价

    Evaluation on Stability of V # Mountain Ridge " Rock Wall " Slope on the Left Bank of Jinping ⅰ Hydropower Station

  10. 澜沧江某电站左岸地下洞室群围岩稳定性的FLAC~(3D)分析

    Numerical analysis with flac ~ ( 3d ) on rock mass stability surrounding cavern group in the left bank slope of a hydropower station on lan-cang-jiang River

  11. 三峡左岸电站ALSTOM机组稳定性分析

    Analysis on stability of ALSTOM units in Three Gorges Left Bank Hydropower Station

  12. L'Hôtel酒店原来只是一间位于巴黎左岸的小旅馆。

    These days , the L'H ô tel was a small hotel on Paris 's Left Bank .

  13. ALSTOM公司为三峡左岸水电站设计的水轮发电机

    The Hydrogenerator in the Three Gorges Left Bank Power Station Designed by ALSTOM Company

  14. 三峡左岸电站VGS机组推力轴承分析

    Analysis of VGS Unit Thrust Bearing for Three Gorges Left-bank Power-plant

  15. 三峡左岸电站VGS水轮发电机组的失步保护

    Out-of-step protection for VGS hydro-generators of Three Gorges Left Bank Power Plant

  16. 在河的左岸,城堡和哥特式圣维特大教堂(St.Vitus'sCathedral)旋转跃入天空。

    On the left bank of the river , the castle and the Gothic pirouettes of St Vitus 's cathedral leap into the sky .

  17. 三峡左岸VGS水轮发电机组的国产化与创新

    Localization and Innovation of VGS Hydropower Generator Unit in Three-Gorge Left Bank Power Station

  18. 三峡左岸电站VGS发电机转子磁轭安装工艺

    Installation technology of VGS generator rotor 's magnet yoke of TGP 's left power plant

  19. 三峡左岸电站VGS机组盘车及总装工艺改进

    Improvements on axis alignment and assembly process of VGS units for Three Gorges Left Powerhouse

  20. 论三峡左岸电站AC550KVGIS优化布置现代化水电站综合自动化方案&兼谈三峡左岸电站自动化方案

    On Optimization of Arrangement for the AC 550 kV GIS in Left Powerplant of the three Gorges Project INTEGRATED AUTOMATION SCHEME OF MODERN HYDROPOWER STATION ── Automatic Control System for Three Gorge First Hydropower Station as the Subsidiary Topic

  21. 负流量对三峡左岸电站ALSTOM机组振动的影响

    Influence of Negative Discharge on Vibration of ALSTOM Units on the Left Bank of the Three Gorges Hydropower Station

  22. G4劈理带的渗漏不是引起左岸地下水位偏高的主要原因;

    The seepage from cleavage G 4 is not the main cause of the high groundwater level .

  23. 三峡水电厂左岸ALSTOM机组尾水管压力脉动分析

    Analysis of Pressure Fluctuation in the Draft Tube of ALSTOM Units in the Left Bank of Three Gorges Hydropower Station

  24. 三峡左岸电站ALSTOM机组导叶小开度振动原因分析及解决方案

    Origin analysis and solution for the ALSTOM unit vibration in small guide vane opening of Three Gorges left bank plant

  25. 运用非连续变形分析(DDA)和强度储备系数法分析了三峡大坝左岸厂房3~坝段的整体抗滑稳定析。

    Powerhouse dam Section in left bank of the Three Gorges Project is calculated with discontinuous deformation analysis and strength storage safety coefficient method .

  26. 在桥的左岸,迪奥(Dior)的一名摄影师在给一名穿着浅橙色连衣裙的女人拍照。

    On the Left Bank side of the bridge , a photographer for Dior photographed a woman wearing a salmon-colored dress .

  27. 三峡左岸电站ALSTOM集团水轮发电机设计制造结构和安装特点简介

    Brief Introduction to the Design and Installation of Hydrogenerators Produced by ALSTOM Group for the Three Gorges Left Bank Power Station

  28. 对三峡左岸ALSTOM机组进行了自然补气和强迫补气试验。

    Natural and compulsory gas - supply tests were carried out on ALSTOM units located the left bank at Three Gorges .

  29. 三峡左岸电站VGS机组推力瓦温偏高及改善措施

    Causes of high temperature of VGS unit 's thrust bearing in left bank power station and improvement measures

  30. 应用大型分析系统软件FINAL,采用特有的接触界面单元模拟潜在滑动面和特殊的锚索单元模拟预应力锚索,对锦屏一级水电站左岸拱肩槽边坡潜在不稳定块体进行稳定性分析和加固措施研究。

    Using a special contact interface element and a proposed bolt element to simulate the slip surface and prestressed anchorage cable respectively , stability analysis for an instable block located in left abutment slope of Jinping Hydropower Station is carried out by software FINAL .