建设期利息

  • 网络interest incurred during construction;interest during construction;IDC
建设期利息建设期利息
  1. 建设期利息计算方法的研究

    A Study of Calculation Methods of Interest in Period of Construction

  2. 引入建贷系数和加权利率,简化建贷利息(建设期贷款利息)的计算方法。

    In the paper , an introduction is given to the construction loan coefficients and weighted interest rate as well as the method to simplify the determination of construction loan interest ( or loan interest for construction period ) .

  3. 三峡工程总投资包括枢纽建筑物总费用、建设征地和移民安置费用、独立费用、基本预备费、价差预备费和建设期贷款利息等六大部分。

    The total investment in the construction of the project includes gross expenditures for the main works , expenditures for resettlement and land acquisition for construction , independent fees , basic reserve funds , reserve funds for price differences , and interest for loans during construction .

  4. 在测算建设期较长的水电项目上网电价时,要考虑通货膨胀因素对上网电价的影响、建设期应计利息的划分、资本金应付利润的支付、拉平初期运行期电价等问题。

    For estimating the power tariff of hydropower project with long construction period , all the following factors shall be taken into account , that is , the inflation factor , the loan interest during construction period , the payable profit repayment and the power price during the operation period .