成都铁路枢纽

成都铁路枢纽成都铁路枢纽
  1. 成都铁路枢纽客运系统的分析与研究

    Analysis and Study of the Passenger Transport System of Chengdu Railway Hub

  2. 客运专线引入下成都铁路枢纽客运站布局规划研究

    Study on Layout Planning of Chengdu Railway Hub Passenger Station after Introducing Passenger Dedicated Line

  3. 成都铁路枢纽北环线框架桥涵顶进施工

    Jacking Construction Technology of Frame Bridge Culverts of the North Ring Line of Chengdu Railway Pivot

  4. 北京西站天桥I段钢桁架工程试拼装新工艺铁路枢纽与城市交通系统的整合研究&成都铁路枢纽为城市服务的实施方案

    NEW TRIAL FIXING PROCESS OF OVERLINE BRIDGE SECTION I STEEL TRUSS FOR BEIJING WEST RAILWAY STATION Study on Integration of Railway Station and Metropolitan Traffic

  5. 文章的第二部分对于成都铁路枢纽参与城市客运交通时的线网和与其他方式的衔接做出了具体的规划及论证。

    The second one takes Chengdu national railway hinge as an applied example using the methods in the first part and makes a specific planning and demonstration for the participation .

  6. 结合成都铁路枢纽北环线框架桥涵顶进施工的实例,简述了框架桥涵顶进施工法在公路下穿铁路线路交叉时的应用及施工技术。

    Combining the practical example of jacking construction of frame bridge culverts of the north ring line of Chengdu Railway Pivot , authors introduce application and construction techniques of the frame bridge culvert jacking construction method in construction of roads under-cross of railway lines .