技术组织措施

  • 网络technical and organization measures
技术组织措施技术组织措施
  1. 浅谈公路工程施工技术组织措施编制

    Preparation of technical organization measures for highway works

  2. 本文主要介绍该工程混凝土施工中所采取的一系列技术组织措施。

    This article describes mainly the series of technical organizational measures taken in the construction of the project .

  3. 着重介绍其生产全过程的技术组织措施,以保证最终产品质量达到高品质标准。

    The thesis introduces the producing process of the production and technology administrative organizing measures to ensure the product reaching high quality .

  4. 以某工程为例,简要介绍了高层建筑外墙大面积釉面砖粘贴的施工准备、施工工艺流程、施工技术组织措施及质量控制措施。

    Taking a project as the example , this paper briefly introduces construction preparation , technical process , technical organization and quality control of veneering enamelled bricks on tall building 's exposed wall with large area .

  5. 亚麻原色水洗布生产技术管理组织措施

    Production and Technology Administrative Organizing Measures of Linen Natural Washed Fabric

  6. 指出工期优化主要有技术和组织等措施;

    Time limit for a project being optional mainly refers to the measures of technique and organization .

  7. 技术措施和组织措施是相辅相成的,二者缺一不可,只有两方面都加强,房地产开发企业才能获得经济效益的最大化。

    Organization and technical measures are supplement for each other , only when both of them were strengthened could a developer acquires the best profit . 3 .

  8. 并要注意技术措施和组织措施(运行管理)相结合,使三相异步电动机经常性地处于经济运行状态。

    Finally , attention should be paid to the combination of technical and organizational measures ( operation management ), So that three-phase asynchronous motors can operate regularly in their economic operating conditions .

  9. 在施工前,要求承包人在编制施工组织设计时,包含施工环保技术措施和组织措施,尤其对容易引起环境污染的工程要提出切合实际的施工方法及技术措施。

    Prior to construction , the contractor is required to include environmental-friendly technical measures for construction and organization measures when working out construction organization design , and in particular , the Contractor shall put forward practical construction method and technical measures for works easy to cause environmental pollution .

  10. 锚固工程施工技术要点和组织管理措施

    Constructive technical points and organized managing methods of anchor fixation project

  11. 通过对引进信息技术或其他组织管理措施的前后分析比较,可以对实施各种组织管理措施进行过程控制和量化测评等。

    In comparing the situation before and after the introduction of IT or other management methods , we can apply procedure control and quantificational measure for various management methods .