接触冲刷
- 网络Contact scouring
-
接触冲刷发展过程模拟研究
Simulation Study on the Contact Scouring Development Between Underground Layers
-
坝基实际渗漏量异常,存在管涌和接触冲刷问题,尤其库水位低至193.84m,坝后上升泉仍有沙沸现象。
The actual seepage quantity of the dam foundation was unconventional , there were the questions of piping of the highly permeable layer and contact erosion , especially , the reservoir level was under 193.84 m , sand boil in ascending spring behind dam appears .
-
采用高压旋喷在坝基建造灌浆盖板,改善了灌浆条件,取得了良好的灌浆效果,并且有效地截断坝基表层的渗漏,减少了坝基的接触冲刷破坏。
Application of high-pressure rotary grunting in constructing grouting decking on the dam foundation can not only improve the condition of grouting and result in a perfect grouting , but also can prevent seepage of dam foundation surface effectively and reduce damage from scouring to the dam foundation .
-
土的渗漏破坏包括四种形式,它们是流土、管涌、接触流土和接触冲刷。
The earth seepage failure includes four types . It 's about mass flow 、 piping 、 contact mass flow 、 contact rush .