接触冲刷

  • 网络Contact scouring
接触冲刷接触冲刷
  1. 接触冲刷发展过程模拟研究

    Simulation Study on the Contact Scouring Development Between Underground Layers

  2. 坝基实际渗漏量异常,存在管涌和接触冲刷问题,尤其库水位低至193.84m,坝后上升泉仍有沙沸现象。

    The actual seepage quantity of the dam foundation was unconventional , there were the questions of piping of the highly permeable layer and contact erosion , especially , the reservoir level was under 193.84 m , sand boil in ascending spring behind dam appears .

  3. 采用高压旋喷在坝基建造灌浆盖板,改善了灌浆条件,取得了良好的灌浆效果,并且有效地截断坝基表层的渗漏,减少了坝基的接触冲刷破坏。

    Application of high-pressure rotary grunting in constructing grouting decking on the dam foundation can not only improve the condition of grouting and result in a perfect grouting , but also can prevent seepage of dam foundation surface effectively and reduce damage from scouring to the dam foundation .

  4. 土的渗漏破坏包括四种形式,它们是流土、管涌、接触流土和接触冲刷。

    The earth seepage failure includes four types . It 's about mass flow 、 piping 、 contact mass flow 、 contact rush .