明洞
- open cut tunnel
-
而采用明洞方案可以最大限度地隔离大风环境与列车运营环境,防风效果好,但存在工程费用高、运营环境较差、施工不便及维修养护工作量大等问题。
The scheme of open cut tunnel can maximize the isolation of wind environment from the train operating environment . The windproof effect is good , but there are problems of high costs , poor operating environment , inconvenient construction work and large amount of repair and maintenance work .
-
五台山旅游公路明洞设计
The Design of Tunnel without Cover of Wutai Mountain Travel Highway
-
铁路明洞行车安全等级的模糊评判
Fuzzy judgment on grade of driving safety for open cut tunnels
-
明洞渡槽方案。
And ( 2 ) the construction of open channel aqueduct .
-
深汕高速公路101滑坡整治新技术&园安抗滑桩明洞
New technology of landslide treatment & yuan'an anti-slide piles and cut-and-cover tunnel
-
铁路明洞结构的可靠性设计方法
Reliability based design method for cut and cover tunnels
-
综合地质预报在某隧道明洞探测中的应用
Application of comprehensive geological prediction in open-cut tunnel detection
-
明洞在崩滑体治理工程中的设计与实践
Design and Practice of Opencut Tunnel for Slump Mas
-
当你第一次来明洞。
When you first came to myundong .
-
爸爸在明洞家族里?
Dad 's in the myundong family ?
-
用响应面方法分析铁路明洞结构荷载效应
Analysis of loading effect on Railway cut-and cover tunnel structure by numerical response surface method
-
采用双浆液整治明洞病害加固软弱地基丙烯酰胺浆液整治隧道渗漏水
Soft Ground Improvement with Cement and Sodium Silicate Using acrylamide mortar to treat tunnel 's leakage
-
某城市公路隧道明洞边/仰坡支护工程施工技术
The Construction Techniques for the Side-slope / Heading-slope Bracing Engineering of the Open-cut Highway Tunnel in a Certain City
-
本文分析了影响铁路明洞行车安全的各种因素,将行车安全划分为五个等级。
Many factors influencing the driving safety of open cut tunnels are analyzed in the paper , and the driving safety is devided into five grades .
-
分析了鸟巢和隧道(或明洞)处鸟类对接触网的影响,并提出了针对性的解决方案。
This paper analyzes on the influences of birds in the bird nest or the tunnel on the contact net , and advances some corresponding solving schemes .
-
对浅埋、深埋、地震区、偏压及明洞等不同情况下的二次衬砌结构进行了计算分析,并作出安全性评价。
Secondary lining structure is computed and analyzed for conditions of shallow burial , deep burial , earthquake region , unsymmetrical pressure and cut-and-cover tunnel , individually , and then safety evaluation of secondary lining is obtained .
-
在此基础上,按校准法对现行标准图明洞结构进行了可靠度计算并选定了目标可靠指标及设计表达式中的分项系数。
On the basis of above research , reliability indices for the 16 cut and cover tunnel structures in standard design drawing album are calculated and an objective reliability index as well as partial coefficients in design equation is selected .
-
给出铁路明洞填土几何形状、填土材料性质及衬砌材料性质的统计结果,利用填土压力的离心模型试验,找出了明洞填土压力计算模式的不确定性。
The statistical results of geometrical and physical parameters for both backfill soil and structural material of cut and cover tunnels are given , while centrifugal model test is employed to figure out uncertainties in calculation formulae of backfill soil pressure .
-
研究结果:通过对衬砌局部受力计算,确定在明洞边墙和仰拱转角处配筋方法和接触网立柱基础附近衬砌局部配筋方法;3.明洞和洞门工程施工技术;
Research results : By calculating the internal force of local lining , this paper determines the reinforcement arrangement method of the local lining at the corner of sidewall and invert in the open cut tunnel , and nearby the base for drop tube for OCS .