梯级水电站

  • 网络cascade hydropower station
梯级水电站梯级水电站
  1. 梯级水电站联合AGC的经济运行

    The Economic Combined AGC Operation of Cascade Hydropower Station

  2. 经实例验证,运用I-PSO调度模型在梯级水电站水库的长期和短期调度中取得良好的优化效果,能够为解决复杂的梯级水电站优化问题提供一条有效、可行的新途径。

    As the case study shows , I-PSO dispatching model obtained well optimal results by applying I-PSO dispatching model in cascade hydropower station , which provided an effective and feasible way to solve complex cascade optimization problem .

  3. 基于ANN的梯级水电站实时优化运行

    Daily Optimal Operation of Cascaded Stations by Using Artificial Neural Network

  4. 梯级水电站日调度优化Tabu搜索方法

    Daily Optimal Operation of Cascaded Hydropower Station Based on Tabu Search

  5. 梯级水电站AGC的实现方法研究

    Study on Realization Method of AGC ( Automatic Generation Control ) in Cascade Hydropower Station

  6. 提出一种求解梯级水电站中长期优化调度问题的方法&蚁群算法(AntColonyAlgorithm,ACA)。

    An ant colony algorithm ( ACA ) to solve the long-term optimal operation of cascade hydropower stations is presented in this paper .

  7. 以人工神经网络(ANN)方法为基础设计了一种梯级水电站运行控制算法。

    This paper presents an artificial neural network ( ANN ) based approach for solving daily optimal operation problem of cascaded stations .

  8. 作为梯级水电站联合优化调度的核心环节,梯级水电站自动发电控制AGC(automaticgenerationcontrol)的研究理应受到足够的重视。

    As the core section of the whole optimized scheduling among cascaded hydroelectric stations , the study for AGC ( Automatic Generation Control ) of cascaded hydroelectric systems should be emphasized enough .

  9. 智能决策支持系统(IDSS)在梯级水电站中的应用研究

    Intelligent Decision Support System ( IDSS ) Applied in the Cascade Hydropower Station

  10. 具有捕获效应时ALOHA方式的基本性能与最优化电力系统中梯级水电站日运行方式最优化研究

    Performance Evaluation and Optimization of ALOHA Scheme with Capture Effect Optimal Daily Operation of Hydroelectric Cascade in a Power System

  11. 最后,通过清江梯级水电站AGC优化计算实例证实本文提出的算法及选用优化数学模型的有效性。

    At last , The case study for the Qingjiang cascaded AGC is executed to show the efficiencies of the proposed algorithm and adopted optimal mathematical models for cascaded AGC .

  12. DPSA和大系统分解协调在梯级水电站短期优化调度中的应用研究

    The application research of DPSA and large-scale system decomposition-coordination for cascaded hydroelectric short-term optimal scheduling

  13. 关于开发新疆塔河一、二、三梯级水电站220kV线路送电的可行性分析

    Feasibility study on 220 kV transmission lines for the No.1 , No.2 and No.3 cascade hydropower stations on the Tarim River , Xinjiang

  14. 针对基本遗传算法存在求解精度与收敛速度间的矛盾,研究了一种新的改进自适应遗传算法(IAGA),并用于求解梯级水电站日优化调度问题。

    A novel Improved Adaptive Genetic Algorithm ( IAGA ) is applied to the problem of determining the optimal hourly schedule of power generation in a cascaded hydroelectric system .

  15. 本文把逐步优化算法(POA)应用到梯级水电站补偿调节计算中,提出了梯级水电站总保证出力最大和对该总保证出力在水电站间进行最优分配的方法。

    This paper presents the application of POA in calculation of compensation adjustment among the cascade hydropower stations . The maximum guaranteed output among the cascade stations and the optimal allocation method among them have also been proposed .

  16. 基于实用的梯级水电站优化运行原则,提出了一种新的针对中小型梯级水电站的经济调度控制(EDC)数学模型,并给出了该模型的工程化求解算法。

    On the basis of the applied principle of optimal operation of cascade hydropower stations , a new mathematic model of economic dispatch control ( EDC ) for small and medium-sized cascade hydropower stations is developed and presented . The engineering algorithm of the mathematic model is also given .

  17. 基于蚁群算法的梯级水电站群优化调度

    Optimal operation of cascade hydropower stations based on ant colony algorithm

  18. 优化得出的梯级水电站的最优运行方案以及市场出清价与实际情况相符。

    Scheduling and market clearing price Optimized accords with real situation .

  19. 跨流域补偿调节的梯级水电站主要参数优选

    Optimization of the parameters for cascade stations with interbasin compensating regulation

  20. 梯级水电站短期周优化调度规律探讨

    Discussion on the short-term weekly optimal scheduling of cascade hydropower stations

  21. 流域梯级水电站节能调度效益评价指标体系研究

    Benefit evaluation index systems for energy-saving dispatching for cascade hydropower stations

  22. 乌江梯级水电站的经济运行研究及应用

    Research and Application of Economic Operation of Wujiang Cascaded Hydroelectric Stations

  23. 梯级水电站最优化运行的数学模型

    A mathematical model of optimization operations for cascade water power stations

  24. 梯级水电站保护信息管理系统的设计与应用

    Automatic information management system of relay protection for cascade hydropower stations

  25. 梯级水电站补偿效益分摊方法研究

    Research on Method of Sharing Compensation Benefits of Cascade Hydropower Stations

  26. 梯级水电站间河道型水库非恒定流调节

    Regulation of unsteady flow in river-type reservoir between cascade hydropower stations

  27. 梯级水电站群优化调度图研究及应用

    The Study and Application for Optimal Operation Chart of Cascade Reservoirs

  28. 浑江梯级水电站设计标准问题

    The Design Standard Problems of Hun River Cascade Hydroelectric Generating Stations

  29. 应用嘉量原理优化梯级水电站开发次序的研究

    Study of applied JAR-METRIC principle to optimal sequence of cascade hydropower plants

  30. 首尾直接连接的长隧洞梯级水电站引水发电系统水力过渡过程模型设计

    Model Design of Hydraulic Transients of Directly Connected Long-tunnel Cascade Power Stations