石泉水电站

石泉水电站石泉水电站
  1. 石泉水电站220kV交联电缆工程

    220 kV XLPE cable project in Shiquan Hydroelectric Power Station

  2. 石泉水电站大坝坝基渗流监测资料分析

    Analysis on the Seepage Observation Data of Gravity Dam in Shiquan Hydropower Station

  3. 石泉水电站陡高边坡崩塌机理分析及加固设计

    Collapse mechanism analysis of steep-high rock slope of Shiquan Hydropower Station and reinforcement design

  4. 石泉水电站水工闸门及启闭机外观检测与评价

    Appearance Inspection and Evaluation of Hydraulic Gate and Hoist in Shiquan Hydro Power Station

  5. 石泉水电站消力戽运行情况

    The Dissipation Bucket of Shiquan Waterpower Station

  6. 在石泉水电站扩机工程设计中,采用了如下设计优化措施:取消调压井;

    In design of the Shiquan expansion project , the following optimal design measures are adopted : The surge tank is canceled ;

  7. 石泉水电站于1998年开始实施大坝监测系统自动化改造工程。大坝规划设置5条坝顶倒垂线。

    The automation rehabilitation project of Shiquan dam monitoring system was put into practice in 1998.Five reversed pendent holes were arranged in Shiquan dam .

  8. 通过对石泉水电站水工闸门及启闭机外观形态、腐蚀及磨损的检测,综合分析和评价了设备的外观状况,对存在问题提出了改进意见和更改建议。

    Based on the inspection of appearance , corrosion and wear of hydraulic gate and hoist used in Shiquan Hydro Power Station , comprehensive analysis and evaluation of the equipment appearance , recommendations for improvement and modification are proposed for the exiting problems .

  9. 1975年建成的石泉水电站位于喜河水电站上游42km,是一座季调节水库,而喜河水电站于2003年动工兴建,是日调节水库。

    The Shiquan Hydropower Station , which was completed in 1975 , is a seasonal regulating hydropower station , 42 kilometers to downstream of Xihe River Hydropower Station . But Xihe River Hydropower Station , which is to be commenced in 2003 , is a day regulating hydropower station .

  10. 筒形阀在石泉二期水电站上的应用

    Application of cylinder valve in stage II project of Shiquan hydropower station

  11. 根据建立的水电站群优化调度分解协调模型,对石泉、喜河水电站进行联合优化调度研究,以44年实测径流系列资料进行长系列优化调度模拟运行。

    According to the established model of decomposition-coordination for group hydropower station , the optimal cooperating operation study is utilized to the Hydropower Stations of Shiquan and Xihe River . Simulative operation of optimal cooperation in series of runoff data measured of 44 years is performed .

  12. 通过对石泉水库不同量级洪水的调度分析,表明石泉水电站扩机增容能够提高对弃水的利用程度和增加电能,中、小洪水的效果尤其显著;

    With the case study of flood regulation for Shiquan reservoir in south Shaanxi , the enlargement of hydropower plant can increase the utilization rate of surplus water and generate much more energy , especially for the middle - or small-floods .