石泉水电站
-
石泉水电站220kV交联电缆工程
220 kV XLPE cable project in Shiquan Hydroelectric Power Station
-
石泉水电站大坝坝基渗流监测资料分析
Analysis on the Seepage Observation Data of Gravity Dam in Shiquan Hydropower Station
-
石泉水电站陡高边坡崩塌机理分析及加固设计
Collapse mechanism analysis of steep-high rock slope of Shiquan Hydropower Station and reinforcement design
-
石泉水电站水工闸门及启闭机外观检测与评价
Appearance Inspection and Evaluation of Hydraulic Gate and Hoist in Shiquan Hydro Power Station
-
石泉水电站消力戽运行情况
The Dissipation Bucket of Shiquan Waterpower Station
-
在石泉水电站扩机工程设计中,采用了如下设计优化措施:取消调压井;
In design of the Shiquan expansion project , the following optimal design measures are adopted : The surge tank is canceled ;
-
石泉水电站于1998年开始实施大坝监测系统自动化改造工程。大坝规划设置5条坝顶倒垂线。
The automation rehabilitation project of Shiquan dam monitoring system was put into practice in 1998.Five reversed pendent holes were arranged in Shiquan dam .
-
通过对石泉水电站水工闸门及启闭机外观形态、腐蚀及磨损的检测,综合分析和评价了设备的外观状况,对存在问题提出了改进意见和更改建议。
Based on the inspection of appearance , corrosion and wear of hydraulic gate and hoist used in Shiquan Hydro Power Station , comprehensive analysis and evaluation of the equipment appearance , recommendations for improvement and modification are proposed for the exiting problems .
-
1975年建成的石泉水电站位于喜河水电站上游42km,是一座季调节水库,而喜河水电站于2003年动工兴建,是日调节水库。
The Shiquan Hydropower Station , which was completed in 1975 , is a seasonal regulating hydropower station , 42 kilometers to downstream of Xihe River Hydropower Station . But Xihe River Hydropower Station , which is to be commenced in 2003 , is a day regulating hydropower station .
-
筒形阀在石泉二期水电站上的应用
Application of cylinder valve in stage II project of Shiquan hydropower station
-
根据建立的水电站群优化调度分解协调模型,对石泉、喜河水电站进行联合优化调度研究,以44年实测径流系列资料进行长系列优化调度模拟运行。
According to the established model of decomposition-coordination for group hydropower station , the optimal cooperating operation study is utilized to the Hydropower Stations of Shiquan and Xihe River . Simulative operation of optimal cooperation in series of runoff data measured of 44 years is performed .
-
通过对石泉水库不同量级洪水的调度分析,表明石泉水电站扩机增容能够提高对弃水的利用程度和增加电能,中、小洪水的效果尤其显著;
With the case study of flood regulation for Shiquan reservoir in south Shaanxi , the enlargement of hydropower plant can increase the utilization rate of surplus water and generate much more energy , especially for the middle - or small-floods .