组装机

  • 网络assemble machine
组装机组装机
  1. 由于其特点,DLD使结构紧凑,各种应用将设立:包装机械,构件组装机,测量机,小支架及操作手

    Due to their characteristics , the DLD enables compactvaried applications to be set up : packaging machines , component assembly machines , measuring machines , small gantriesmanipulators

  2. 电力工业所面临的是日益加大的峰谷电差,因此就必须加大占全国火电机组装机容量1/3的国产300MW机组的调峰任务。

    One of problems China 's power industry facing now is ever increasing peak valley load difference . Hence the peaking duty of indigenous 300 MW generating units sharing 1 / 3 of national total thermal installed capacity must be increased .

  3. 1999年,我在电脑城买回自己的第一台电脑,组装机。

    In1999 , I bought my first computer which was an assembled .

  4. 主营电脑配件、品牌电脑、电脑组装机、电脑软件!

    Main computer accessories , branded computers , computer assembly , computer software !

  5. 磁力成形组装机及其应用

    Combined magnetic forming machine and its application

  6. 本医用器械组装机的上料装置工作效率高、卫生安全的优点。

    The feeding device of the medical apparatus assembling machine has the advantages of high operation efficiency , hygiene and safety .

  7. 峰荷机组装机容量的确定直接影响到峰荷时段的电价尖峰水平和供电可靠性等问题。

    The capacity of peak load unit directly affects peak electricity price level and reliability of power supply during peak load period .

  8. 它解决了现有的医用器械组装机的上料装置手工操作的问题。

    The feeding device solves the problem related to the manual operation of the feeding device of the prior medical apparatus assembling machine .

  9. 随着我国风电机组装机容量的逐渐增加,风力发电在电网中所占比例也逐年增大。

    With the gradual increase in the installed capacity of wind turbines in China , windpower in the grid in the proportion of increased every year .

  10. 风力发电是当今世界发展最快的能源项目。1998-2002年,风力发电装机容量以年均32%的速度高速增长,到2002年底世界累计风电机组装机容量超过31000MW。

    Wind energy is the world 's fastest-growing energy source with installed generating capacity increasing by an average 32 % annually for the five years ( 1998-2002 ) .

  11. 随着世界各国风电机组装机规模的迅速膨胀,主流风电机组机型的单机容量也在不断增大。

    With the rapid development of the installation scale of wind turbine generators in countries all over the world , mainstream single-unit wind turbine rated power is increasing continuously .

  12. 考虑到机组可用率、运行成本和维护成本等影响因素,研究了总成本最小化的峰荷机组装机容量量化模型。

    Taking the generator availability , operation cost and maintenance cost into consideration , a quantitive model of the optimal capacity for peak units is developed based on minimal total cost analysis .

  13. 随着国内风力发电机组装机容量的增加,大规模风电机组并网运行对电力系统稳定性的影响日趋明显。

    As the installed capacity of wind turbines increases in our country , the impact on the stability of power systems considering large-scale wind power connected has become more and more evident .

  14. 随着风力发电机组装机容量的不断扩大,其在电力系统中的比重逐步增加,并网运行的风力发电场与电力系统之间的相互影响也随之加大。

    With constantly increasing of installed wind capacity , the proportion of wind power in power system gradually increase , the mutual influence between wind power and power system will be increasing .

  15. 而我国的电力工业以火力煤炭发电为主,并将在长期内保持火电机组装机容量的增长。

    While the power industry in our country are based on fire coal power generation , and will keep the increase of the Installed capacity of thermal power units in a long time .

  16. 随着我国北方富煤缺水地区火电空冷机组装机迅速增加,对空冷机组中的关键技术的研究更为迫切。

    It is urgent that the study of the key technology in cooling units with the rapid development of the power plant installed capicity in the poor water and plentiful coals in North China .

  17. 随着风电机组装机容量的不断增长,占电网比例也逐年提升,电网规则对风电并网提出了更高的要求。

    With the continuous growth of the installed capacity of wind turbine , the proportion accounting for grid also increases year by year , and the grid rules put forward higher requirements for wind power .

  18. 随着我国各大电网机组装机容量的不断扩大,以及用电结构的调整,高参数、大容量机组在电网中担任调峰工作已成为必然。

    With the increase of unit capacity in the electric net and the adjustment of electric consumption structure , it is inevitable for large capacity and high parameter unit to be operated in off-design condition .

  19. JZS156SFⅠ井下工具组装试验机

    JZS 156SF I Assemble-and-Test Machine for Downhole Tools

  20. 单柱拉直组装液压机

    Hydraulic single column straightening and assembling press

  21. 他想了各种不同的点子,最后决定进入计算机行业,用从国内采购的零部件组装兼容机。

    He ended up entering the computer business , building DIY machines assembled from components sourced in China .

  22. 解决在组装/机加工车间跟质量、成本、迅捷、安全及环境相关的瓶颈问题并达到目标。

    Solve bottle-neck engineering in concern with quality , cost , delivery , safety and environment in Assembly area / Machining area and achieve the target .

  23. 已用TTL小规模集成电路组装了模型机,验证了设计的正确性。

    Its correctness has been Proved by using the model computer which was assembled with the small scale TTL integrated Circuits .

  24. 摩托车发动机气门导管组装压入机的设计

    The Design of A Special Purpose Machine Tool for Engine Valve Guide Fitting of Motorcycle

  25. 14×8运载车(XD70/14×8)主要用于组装150t修井机、3000m钻机。

    The 14 × 8 carrier ( XD70 / 14 × 8 ) is mainly used for assemble 150 ton work-over rig and 3000 meter drilling rig .

  26. 南阳石油机械厂研制的12×8运载车(XD60/12×8),主要用于组装120t修井机和200m钻机,其气控系统可实现油门。

    12 × 8 truck ( XD60 / 12 × 8 ) developed by Nanyang Petroleum Machinery Works is used for assembling 120t workover rigs and 2000m drilling rigs .

  27. 核电站用燃烧棒组件组装&拉棒机控制系统的研制

    Element Puller Control System Design for Fuel Module Assembly of Nuclear Power Plant