集装箱列车
- 网络Container train;freight train
-
双层集装箱列车过隧道空气压差阻力实验研究
Experimental research on pressure drag of the double container car passing through tunnel
-
集装箱列车和客运列车可以在同一条路线运行。
According to He , container trains and passenger trains could run on the same route .
-
方案I用普通集装箱列车送入结点站;
In scheme I , containers are fed into a junction railway stations in ordinary container trains .
-
美国、加拿大、澳大利亚等限界较大的国家都积极开行了双层集装箱列车。
Many countries with large clearance , like USA , Canada and Australia , have run the double-stack container trains .
-
在中欧班列乌鲁木齐集结中心,一列满载新型建材的集装箱列车启程奔向欧洲。
At the service hub for China Railway Express in Urumqi , a cargo train loaded with construction materials is leaving for Europe .
-
(目前,许多集装箱列车从欧洲返回时都是空驶,另一些则装有汽车、汽车配件和制造设备。)
( Right now , many containers are sent back from Europe empty ; others are filled with cars , car parts , and manufacturing equipment . )
-
他还补充道,如果能找到高价值商品卖给中国,让集装箱列车不至于空手而归,就可以进一步降低运营成本。
And , he adds , operators could further lower costs by finding high-value goods to sell back to China , making sure containers do not return empty .
-
唯一的区别只是速度,客运列车以250至300公里的时速运行,而集装箱列车的运行时速是120公里/小时。
The only difference would be speed . A passenger train could run at 250 to 300 kilometers per hour , while a container train could run at 120 km / h.
-
为了给列车牵引计算提供依据,在遂渝线上对双层集装箱列车过隧道时空气压差阻力进行了实车测量。
In order to provide the basis of the traction calculation of the train , the experiment of the pressure drag when a double container car passes a tunnel was carried out in the Suining-Chongqing railway line .
-
集装箱汽车列车与桥梁护栏碰撞分析
Crash Analysis between Container - trucks and Guardrails
-
讨论了集装箱汽车列车鞍座结构的处理,提出了鞍座阻力矩的计算方法。
The joint simulation is discussed and calculation method of its resistance moment is proposed .
-
误工排序问题的赶工分析集装箱汽车列车与桥梁护栏碰撞分析
Crash Analysis between Container-trucks and Guardrails
-
讨论了几种典型列车的空气动力性能:中华之星高速列车、双层集装箱货运列车、磁浮高速列车;
The research works of the aerodynamic performances of China representative train , China-star high-speed train , double deck container freight train , maglev train ( magnetically levitated train ) were introduced .
-
集装箱结点站列车开行方案研究
Research on the Projects of Trains Operation in a Container Crunode Station
-
铁路集装箱中心站列车装卸作业的仿真研究
Simulation Study of Loading / Unloading Operation on Train in Railway Container Terminal
-
最后,通过对京沪双层集装箱运输通道进行箱流预测,制定了京沪间双层集装箱列车的开行方案及运行方案。
Through forecasting OD container volume on Beijing and Shanghai railway , the operating and running plan of double-stack container train on this railway is determined .