仰山
-
仰山一级站大坝施工质量管理与监督措施
Measures of Quality Control Adopted at the Dam Construction of Yangshan First Cascade Hydropower Station
-
仰山一级水电站砌石空腹重力坝施工
The Construction on stone Masonry Hollow Gravity Dam at the Class One Hydroelectric station in Yangshan
-
仰山一级站大坝基础帷幕灌浆施工多方采取措施,改善施工条件;
The main construction methods of the Yangshan first cascade hydyop-ower station curtain grouting are as follows : improving construction condition .
-
仰山三级电站引水隧洞糙率原型观测虚糙率的成因分析
Original Observation of the Roughness on the Access Tunnel of Yangshan Three-cascade Hydro-power Plant Analysis of the Cause Forming Imaginary Roughness
-
在仰山一级站大坝工程施工质量管理和质量监督上采取的措施是:①甲乙双方都建立了质量监督体系,设置了不同层次的质量监督岗位;
Measures of quality control adopted at the dam construction of Yangshan First Cascade Hydropower station are as follows : 1.The constructor and the investor had set up its system and positions of quality control .