  1. GPSRTK系统在长子县引水工程中的应用

    The Application of GPS RTK System in the Diversion Project of Zhangzi County

  2. BEAM地质超前预报系统在锦屏引水隧洞TBM施工中的应用

    The Application of the Beam Geological Advance Prediction System for the TBM Construction of the Jinping Diversion Tunnel

  3. 我们能引水上山吗?

    Can we conduct water uphill ?

  4. 在现有吹塑薄膜机组上生产农用PE引水软管

    Production of PE Diversion Soft Tube for Farming with the Existing Blown Film Moulders

  5. 基于BP神经网络的黄河下游引黄灌区引水量分析

    Analyzing Water Diversion Demand For Irrigation Areas at Lower Reach of Yellow River with BP Neural Network Techniques

  6. HK砂浆在莲花水电站1号引水隧洞补强加固工程中的应用

    Application of HK mortar in reinforcing the water tunnel in Lotus hydropower station

  7. 浅谈锦屏电站引水隧洞TBM施工测量方法

    Discussion on the Measure Method of the TBM Construction for the Diversion Tunnel of Jinping Hydropower Station

  8. 计算结果表明,本文采用PSO算法的优化配水模型所得出的轮灌组引水持续时间均匀性略优于现有其他方法。

    The comparison of the calculation result shows that the uniformity of irrigation duration for rotational irrigation sets obtained by the proposed method is slightly better than that of other methods .

  9. 引水隧洞跨度大,现场量测、观察难度较大,尤其是TBM施工掘进速度快,支护跟进迅速。

    Diversion tunnels ' span are large , on-site measurements and observations are difficult , especially in the construction of TBM driving fast and supporting up quickly .

  10. 菹草(Potamogetoncrispus)的生态习性和在京密引水渠的发生规律研究

    Study on Ecological Habits of Potamogeton crispus and Its Growth in Jing Mi Cannal , Beijing

  11. 通过ETM卫星影像和野外考察分析了工程引水隧洞线路区断层的空间分布及活动特征。

    Through ETM and exploring in site , analyze the distribution and the activity of active faults , evluate faults influences on the stability of deeply buried long tunnel .

  12. 缅甸DAPEIN(I)水电站引水发电隧洞进水口高边坡稳定分析

    Analysis of high slope stability of the entry of water tunnel of DAPEIN ( I ) Hydropower Station in Burma

  13. 小浪底水库如采用设计的逐步抬高蓄水位的运用方式,水库运用前6a水位不能满足引水要求。

    If the operation model of lifting step by step is applied in Xiaolangdi reservoir , the water level in the first 6 years during reservoir operation will not match the demand for water drawing .

  14. 分析结果表明,九溪新增引水工程使下游水厂引水口含氯度超标时数增加不多于100h,在可承受范围之内。

    The result shows that the new diversion work will increase less than 100 hours of the ( period ) of the chlorinity exceeding the assessment criteria , which is acceptable .

  15. 应用该方法对辽宁阜新引水工程GPS网进行试验,在9.6km的跨越距离上,试验结果与独立的三等几何水准结果比较,差值为12mm。

    Based on the above method , GPS network of the Liaoning Fuxin Channeling Water Project was tested . At a distance of ( 9.6 km ,) the transferred normal height difference by this method is 12 mm , compared with that by independent ⅲ grade leveling .

  16. 边坡最大组合坡高达420m,上游与倾倒蠕变岩体自然边坡连成一体,坡脚布置有9条大直径引水隧洞,其下与导流洞进口开挖区连成一片,形成轮廓复杂的高边坡。

    Nine big excavation water-intaking tunnels lie at its foot . It is interconnected with excavated slope of the diversion tunnel 's intake , forming a high slope with complex outline .

  17. 针对海滩淤泥段地基持力差、腐蚀性强的特点,青岛棘洪滩水库-黄岛引水工程海滩淤泥段引水管线采用DN1200玻璃钢管材。

    In view of the little underpinning and strong corrosiveness of the seaside silt , DN1200 GPRMP was used in the seaside part of Qingdao Jihongtan Reservoir Huangdao Water Supply Project .

  18. 利用引水区和黄河上游地区25个站1951&2000年50a的气温和降水逐日资料,分析了研究区域降水的时空分布特征;

    Using the daily data of temperature and precipitation from 25 stations in the water diversion areas and the upstream areas of Yellow River from 1951 to 2000 , the temporal and spatial characteristics of precipitation in these areas are analyzed with the EOF method .

  19. 三峡左岸电站厂房属坝后引水式厂房。机组为立轴混流式,单机容量700MW,总装机容量9800MW。

    The Three Gorges left powerhouse located at the left dam toe is of a diversion type , has a total installed capacity of 9 800 MW and 14 vertical shaft turbines of 700 MW each .

  20. 阀门结构在复杂引水管道中引起的自激振动

    Self - excited Vibration of Valves in Complicated Water Diversion Conduits

  21. 光电测距仪在引水隧洞施工测量中的应用

    Application of Photoelectric Rangefinder to Construction Surveying of Water Delivery Tunnel

  22. 遗传算法在跨流域引水工程优化调度中的应用

    Application of genetic algorithm in optimization operation of interbasin water diversion

  23. 梯级引水工程水位优化调度模型研究

    Study on Optimal Water Level Models of Large-scale Delivery Water Project

  24. 大规模引水隧洞群施工方案三维有限元分析

    3-D FEM analysis for excavation sequence of large scale power tunnels

  25. 嵊州引水工程贴边岔管方案的有限元计算

    Finite Element Analysis of Hem Reinforced Branch Pipe in Diversion Works

  26. 低水头引水工程消能措施试验研究

    Experimental Research on Energy Dissipator of Diversion Works in Low Head

  27. 跨流域引水工程对晋江水环境容量的贡献

    Contribution of Interbasin Diversion Works to Water Environmental Capacity of Quanzhou

  28. 宝钢长江引水工程取水系统

    Changjiang River intake system of Bao Shan iron and steel works

  29. 中、小型引水式水电站水工设计经验介绍

    Hydraulic design experience on small and medium-sized diversion type power station

  30. 嘉兴市长距离跨流域引水工程方案反思

    Thinking About Long-distance and Cross-basin Water Diversion Works in Jiaxing City