作业时间
- 网络operation time;cycle time;tact time
-
使棉花工业的生产方法标准化以提高生产效率通过标准化作业时间和产线平衡,提升生产能力。
Fordize the cotton industry To identity the productivity improvement opportunities by standardizing the process cycle time for each station and line balance .
-
在工业工程中,生产线平衡率是衡量生产线各工序作业时间平均化状况以及生产线生产效率的指标。
In engineering , Line Balancing Rate is the quota that measures the average situation of every cycle time in working procedure and the production efficiency on processing line .
-
例如,所有这些都导致青少年家庭作业时间和睡眠时间减少。
For example , all contribute toteens having less time for both homework and sleep .
-
基于现代IE的微型电泵装配作业时间研究
Study on Assembly Time for Micro Electric Pump Based on Modern IE
-
垂直角观测(VAM)的质量与作业时间有关。
The quality of vertical angle measurement ( VAM ) relates to the operation time .
-
燃气动力一体化打水泥塞工艺施工周期短,注水泥过程仅需几分钟,总共作业时间约2h;
The integrated plug setting technique demands short operation time ( a few minutes are needed in cementing and total operation time is about 2h );
-
根据从现场获得的数据,应用MOD法确定了各动作的标准作业时间。
With the dada collected from the production line , MOD method is used to determine the standard operational time for each activity .
-
传统的DST钻杆测试作业时间长、测试费用高、易造成环境污染。
The traditional DST ( Drill Stem Test ) is long in operation time , high in cost and easy of polluting environments .
-
利用现代IE技术、工作研究的方法和数理统计的理论,提出了微型电泵的标准装配作业时间确定的方法。
The method of determining the standardized assembly time of micro electric pump is put forward by means of industrial engineering ( IE ) technology , work study method and mathematical statistics theory .
-
平均每口井浸泡时间缩短8.15d,平均机械钻速提高32.4%,固井合格率为100%,完井电测一次成功率由60%提高至72%,平均完井作业时间缩短4d;
Cementing qualification rate reached 100 % and completion logging success rate improved from 60 % to 72 % , and the average completion operation time shorted by 4 days .
-
针对工程计划中工序作业时间的不确定性,传统网络计划方法缺乏数学表达能力的问题,提出了用模糊时间Petri网(FTPN)表达工程计划的新模型。
Due to the time uncertainty of activities and the absence of formal description of project scheme , a new model is proposed based on the fuzzy-timing petri net ( FTPN ) .
-
以间歇移动流水线为研究对象,分析了其特点和作业时间构成,并使用KW启发式算法和改进的MY方法相结合的方法进行生产线工序组织设计,最后给出了流水线平衡状况的评价指标。
At first the lines ′ characteristics and components of work time are analyzed . Then working procedures are designed using K-W ( Kilbriage-Weste ) heuristic arithmetic and M-Y ( Moodie-Young ) method . Finally the evaluating indexes for line balancing are presented .
-
并对生产实际加工过程中的在制品库存数量,各工序的作业时间、员工人数和一次合格率(FTT)等基础数据进行了说明,为未来价值流规划提供依据。
And the paper described the quantity of the work-in-process inventory about machining process , process operating time , number of employees , the rate of first time through ( FTT ) and other basic data .
-
立井掘进作业时间分布规律的探讨
An Approach to the Probability Distribution of Shaft Sinking Operation Time
-
海明威和作业时间写了他的故事。
And the job gave Hemingway time to write his stories .
-
调查结果显示:学生作业时间严重超标;
The result indicates that students are overloaded with homework ;
-
基于标准作业时间和仿真的装配线规划
Assembly Line Planning Based on Standard Work Time and Simulation
-
用工作抽样法研究作业时间,提出了系统的改善方案。
The systematic method is proposed by time study of work sample .
-
技术不足,未能掌握正确方法及操控作业时间。
Poor technique in proper method and time control acquisition .
-
作业时间为梯形模糊数的并行多机调度问题
The concurrent multimachine scheduling of fuzzy job time being trapezoid fuzzy number
-
本文件服务为指导,甲骨文公司制造的前置作业时间。
This document serves as a guide to Oracle Manufacturing Lead times .
-
船舶作业时间百分数的计算与分析
The calculation and analysis of the percentage of the task time of ships
-
反应时间随着作业时间的延长而增加。
Response time increases during the period of work .
-
海上作业时间的推算
Estimation of potential working time for operation at sea
-
作业时间随机性及其影响分析
Analysis of Randomicity of Operation Time and Its Effect
-
建立了不同的加工零件与作业时间之间的数学模型;
Mathematical effect model between kinds of parts and operating time is established .
-
抗震作业时间地点与救灾人员心理状态的相关性
Relationship between rescuing time or zone and mental status of succors after earthquake
-
工序作业时间实现可能性的新判定法
A New Method for Judging the Possibility of Realizing a Working Procedure Duration
-
根据建设工程的不确定性特征,针对不确定性网络计划,运用模糊理论建立了工序作业时间的模糊隶属函数;
Construction project has the character of uncertainty .
-
施工中应合理选择摊铺机械、作业时间、作业参数等。
Proper spreading machine , working time and operation parameters should be reasonably selected .