大修工程

  • 网络heavy maintenance;MRO
大修工程大修工程
  1. 城市道路大修工程的设计与施工

    Design and Construction of the Heavy Maintenance Engineering of Urban Roads

  2. 旧油石基层再生利用施工技术在大修工程中的应用

    Application of construction technique for recycling asphalt from old base course to the heavy maintenance

  3. GTM法在高速公路沥青路面大修工程中的应用

    Application of GTM Method in Expressway Asphalt Pavement Overhaul Engineering

  4. 从而导入关键链项目管理(CCPM)的方法,较好地解决了工期不确定性因素较多、工序关系复杂的国道大修工程进度管理。

    Thus introducing critical chain method , can solve the time more uncertain factors , process the complicated relationship between the national highway overhaul project schedule management .

  5. 在广西G324线岑溪至容县一级公路路面大修工程(梧州段)中,对其水泥稳定碎石基层采用的是就地冷再生的施工技术和方法。

    The cold in-place recycling construction technology of cement stabilized macadam base is applied in a pavement overhaul engineering of Cenxi-Rongxian arterial road Wuzhou section of G324 in Guangxi .

  6. 提高城市道路大修工程路面质量的探索

    Raise the Road Faces Quantity of Overhaul Engineering for City Road

  7. 土工格栅在双西线路面大修工程中的应用

    The Application of Geogrid in Heavy Maintenance of Shuang-Xixian Asphalt Pavement

  8. 精细管理在冶金企业铁路大修工程中的实践

    Practice of the fine management in metallurgical enterprise railway overhaul engineering

  9. 高速公路沥青路面大修工程综合技术研究

    Research on Comprehensive Technologies for Heave Maintenance of Asphalt Pavement of Expressways

  10. 模糊综合评定改造性大修工程立项

    Comprehensive Fuzzy Evaluation on The Approval of Reformative Overhaul Project

  11. 高速公路大修工程施工安全保畅方案研究

    Study on the Smooth-traffic Project Evaluation for Overhaul of Expressway

  12. 发电厂大修工程网络进度计划管理软件

    The PERT Plan Management Software Used for the Overhaul Engineering in Power Plant

  13. 深汕高速公路西段路面大修工程设计方案

    The design plan of west section pavement heavy repair engineering in Shenzhen-Shantou express highway

  14. 唐钢2高炉大修工程炉壳设计与受力分析

    Furnace shell design and stress analysis for 2 # blast furnace of Tang Steel

  15. 旧沥青路面就地冷再生技术在连鞍线大修工程中的应用

    Application of Cold-in-place Recycling Technology for Old Asphalt Pavement in Lian-An Highway Rehabilitation Project

  16. 国道大修工程沥青混凝土路面缺陷控制

    The Deficiency Control on Asphalt Concrete Pavement of National Road Major Maintenance Construction Project

  17. 经过20多年的发展,我国高速公路的大修工程日益增多。

    Passed through twenty years , the domestic expressway overhaul projects have been progressively increased .

  18. 京杭运河淮阴二线船闸大修工程变形观测分析

    Measurement and Analysis of Deformation of Huaiyin Secondary Ship Lock on Beijing-Hangzhou Canal in Its Overhauling

  19. 某高速公路左幅大修工程环境影响分析与对策

    On analysis of large repair construction environment of left part in some highway and its strategy

  20. 最后,总结了关键链技术对其他大修工程项目进度管理方面的启示。

    Finally , summed up the critical chain technique to other overhaul project management aspects of the enlightenment .

  21. 本文的研究结果对高等级公路大修工程项目成本管理有一定的借鉴作用。

    The result of the research can provide reference for the cost management in higher level highway rehabilitation .

  22. 同时计算了某港大修工程中的港内波高,以判断其泊稳条件,充分发挥了本模型的工程实用性。

    In addition , wave height is computed in a harbor to judge whether the berth condition is safe enough .

  23. 湘钢2~高炉拆除大修工程安全技术管理

    Safety Technology Management in Demolishing and Rebuilding Engineering of Blast Furnace 2 ~ # in Xiangtan Iron and Steel Company

  24. 随着国民经济建设的飞速发展,特大型高炉工程的短期化扩容大修工程已成为高炉大修的重要课题之一。

    Because of national economy developments , the BF engineering has become one of the important lessons of the short-time engineering .

  25. 最后通过广佛高速公路大修工程的实例分析,验证了优化配置模型的实用性。

    At last , the practical value of the optimized configuration model is testified by the case study on the Guang-fo expressway overhaul engineering .

  26. 最后建立起相关的缓冲管理机制,解决大修工程项目的进度管理问题,并通过该机制对项目的进度进行管理。

    At last establishes associated buffer management mechanism , to solve the overhaul project management problems , and through the mechanism of project schedule management .

  27. 浅谈石化装置检修改造工程的施工组织宝钢二号高炉易地大修工程预热器安装施工

    DISCUSSION ON CONSTRUCTION ORGANIZATION OF MAINTENANCE AND MODIFICATION OF PETROCHEMICAL PLANTS ; The preheater adjusting construction of Baogang No.2 blast furnace allochthonous previous repair project

  28. 论文以广州北环高速公路全封闭大修工程项目为依托,从业主管理的角度,提出了高速公路大修的管理和组织模式。

    Which is based on the Guangzhou north ring expressway overhaul project , brought forward the overhaul management and organization from the owners ' point of view .

  29. 本文阐述了广钢3~高炉大修工程配套空压站设计方案的选定和实施。

    This article describes the selection and implementation of the design draft for the air compressing station to be matched with the overhaul for No. 3 Blast Furnace in GISE .

  30. 通过沥青混合料冷再生技术在秦皇岛市大修工程中的应用,介绍就地冷再生技术的施工工序及现场质量控制要点,阐述了沥青冷再生技术的意义及冷再生混合料应用前景。

    By the application of cold regeneration technique for cast-in-situ bituminous pavement , the paper introduced the construction procedure and quality control of cold regeneration , and discussed its significance and prospects .