实际造价
- 网络Actual cost;actual building cost
-
但对该问题的研究,还存在理论分析不完善、实际造价昂贵等问题。
There are some problems existing in the research concerning the improper theoretical analysis and high actual costs .
-
应用模糊数学原理和灰色理论,建立了快速、准确地预测工程实际造价的数学模型。
This paper presents a mathematical model by use of fuzzy mathematics and gray theory for estimating engineering cost in a fast and accurat way .
-
建筑业中,生产过程中的实际造价与预算造价很有可能出入很大,这样就发生了造价差异。
In the construction industry , it is highly probable that actual costs incurred in the production process will differ from those predicted , i.e. cost variances will occur .
-
阐述工程造价的材料价差是引起工程造价超差的主要原因,并提出处理材料价差的办法和建议,以求工程的概预算造价尽量贴近实际造价。
An illumination to conclude that the shortage of project cost mainly resulted from the underestimation of construction materials and measures taken to properly rectify the deviation so that actual project expenditure could be approximately budgeted .
-
在实际建筑工程造价管理中运用工程量清单计价模式的一点思考
A Few Thinking about Applying the Model of Bill Quantity Calculating Price in Practical Construction Cost Management
-
新建铁路秦沈客运专线工程设计时速达200km/h,是我国铁路史上一个重要的里程碑,其建设管理规范结合施工实际总结了造价管理经验,并对工作中发现的问题提出改进建议和意见。
The design speed of the QingShen passenger transport special line founded newly is at 200 km / h. It is an important milestone in our country railway history . In this paper combined with actual project , the cost management experience is summarized .
-
这4种方法都有一定的理论依据,但是实际效果以及工程造价都有很大差别。
These four ways have a theory each , but the actual effects and engineering cost are very different .
-
作为预决算审查人员,不仅要有良好的政治素质,还要有较高的业务素质,根据实际情况灵活掌握审查方法,以便能实事求是地客观地反映工程实际造价。
The personnel of budget and final accounts must have good political and vocational quality to be able to apply flexibly ways of investigation so that the actual cost of a project can be reported objectively .