工期

gōng qī
  • Duration;time limit for a project
工期工期
工期 [gōng qī]
  • [time limit for a project] 指一项工程完工的时间限制

工期[gōng qī]
  1. 工程的工期具有时间价值。

    The time limit for a project has the characteristic of time value .

  2. 投资、质量、工期是建设工程项目的三大控制目标,核心是投资问题。

    Investment , quality and the time limit for a project are the three control objectives for construction projects , and the core is investment .

  3. 承包商如延误工期将被处以巨额罚款。

    Contractors who fall behind schedule incur heavy financial penalties .

  4. 隧道工程已经晚了工期。

    The tunnel project has already fallen behind schedule .

  5. 我们的工期很紧。

    We 're working to a very tight deadline .

  6. 这个项目的工期是多长?

    What 's the timescale for the project ?

  7. 建筑进度落后于工期。

    Construction work fell behind schedule .

  8. 提高效率,缩短工期。

    Increase efficiency and shorten the time limit for the project .

  9. CPM中工期分阶段控制及资源消耗均衡优化

    Stage & control Constructure and Proportional Distribution of Resource Consumption in CPM

  10. 基于TIA的工期延误分析

    TIA for the Analysis Methods of the Claims for Extension of Time

  11. 以PVS沉淀法和荧光免疫检测法,考察爪蟾V、V工期卵母细胞是否有内源性的LDLR。

    ㏕ o investigate whether Xenopus Oocyte have endogenetic LDLR with PVS Sedimentation and Fluorescence detection .

  12. 以全面质量管理理论(TQM-totalqualitymanagement)为基础,研究合理质量成本的确定与控制方法。3)对造价、工期、质量三大目标进行多目标优化分析。

    The reasonable quality determination and control method is studied on the base of TQM ( Total Quality Management ) theory . Thirdly , optimization analysis according to the multi objects such as time , cost and quality was done .

  13. FIDIC施工合同条件下不完全顺延工期赶工索赔的处理

    Claim for hurry work of incomplete construction period delay under FIDIC contract conditions

  14. 采用DB(Design,Build)工程总承包的方式进行最低投标价中标项目工程承包,可以更有效地节省投资、控制工期,促进总承包企业的培育,提高设计和施工企业的整体素质。

    Using DB ( Design-Build ) in the Lowest Price Proposal Selected procedures has better effects in saving funds and controlling schedule and therefore enhancing quality of the industry of design and construction as a whole .

  15. 同时,应用GIS的技术和可视化施工技术,保证了工期和工程质量,取得较好的工程经济效益和社会效益。

    The application of GIS technique and visualized construction technique , which ensured the completion of the project within the time limit with excellence quality and lead to good economic and social benefits .

  16. 建设工程在FIDIC施工合同条件下的工期索赔管理是工程项目管理工作的一个重要环节。

    Management of working-day claims for construction projects in FIDIC construction contracts is an important part of project management .

  17. 碳纤维材料(CFRP)具有强度高、质量轻、耐腐蚀,施工简便、工期较短等优点。

    Carbon Fibre Reinforced Plastic ( CFRP ) features advantages such as high strength , low weight , corrosion resistance , easy construction and short construction period .

  18. 浅谈机电安装工程的项目管理PERT技术在机电安装工程中的工期&人力资源优化实例

    Short Discussion on Project Management of Electromechanical Installation Works Optimization case of time-human resources based on PERT technology in electromechanical projects

  19. CFG桩在处理回填土、淤泥质土等软基时施工方便、工期短、有很大的经济优势。

    In treating soft foundation of man fill , mud , CFG Piles have the advantages of easy to construct , short construction period and economic .

  20. 在对运行的输电线路的普通地线更换为架空复合光缆地线(OPGW)的施工中,因改造线路停电时间短,地线更换范围大,工期及安全问题显得比较突出。

    After the running transmission line power cut , it often happens that common ground wire changes the aerial complex optical ground wire .

  21. 但在试验中我们发现CL网架板混凝土单面预制存在很多不足,CL网架板混凝土双面现浇更有利于结构的整体性,使施工工序简化,质量控制点减少,大幅缩短工期。

    But in experiments , it is found that there are defects in one-sided prefabrication of CL complex wallboard concrete , and two-sided cast is much better for the unity of the structure .

  22. 工程全部采用ADG系列脚手架和临时看台系统进行有机组合,工期为40天。

    ADG series of works by all the scaffolding and temporary stands system organic combination , for the period of40 days .

  23. 在探讨了BP神经网络的发展和应用性问题后,将LMBP算法作为本文BP网络的算法,并在此基础上建立了建筑施工工期&安全评价模型。

    Thesis discusses the development and application problems of BP neural network and put LMBP algorithm as this BP network algorithm to establish a construction schedule - safety evaluation model based on it .

  24. CFG桩因其承载力高、沉降量小、造价低、工期短等优点在软土加固工程中得到广泛应用。

    In projects like this , CFG-Pile is widely used . It is known for its high bearing capacity , small settling amount , low cost and short field time .

  25. 因此,本文论述了怎样将模糊工期分析与启发式算法结合起来,在存在不确定性因素的情况下,给出Job-Shop的排序计划。

    Therefore , this thesis discusses how to integrate the fuzzy analysis of the time-limit with the heuristic algorithms to find the Job-Shop schedule under existence of the uncertain factors .

  26. 应用GERT(GraphicalEvaluation&ReviewTechnique)理论研究工期对造价的影响,建立量化分析模型,解析法与模拟相结合对工期和造价优化计算。

    The GERT ( Graphical Evaluation & Review Technique ) is used to analyze the relation of the time and the cost . The quantitative analysis model is built to optimize the time-cost using the analytic and simulation method .

  27. 本文通过对传统PERT网络模型数学分析方法及其假设条件的深入分析,指出了传统PERT网络工期分布规律并非正态,而是呈现偏态。

    Based on the analysis of the mathematical method and its hypothesis , this paper points out that the PERT network construction time distributing pattern is not normal distribution .

  28. 工程中采用XPS外墙外保温技术,可提高建筑物的节能和保温效果,并具有防水效果佳、缩短工期、施工便捷等优点。

    When used in the engineering , this technology can not only improve the energy-saving and insulating effects of the building , but also has the advantages of good waterproof , short construction period , easy construction and etc.

  29. 在EPC总承包模式的项目中,设计管理同样处于整个项目工作的核心地位,对项目质量、工期和成本管理等有着最重要的和最直接的影响。

    In the EPC-mode engineering general contracting project , design management is still in the core position of the whole project and thus has the most important and direct influence on project quality , completion time and cost management .

  30. 通过应用SDH组合器(P-Switch)交叉连接设备,大大减少了PCM设备数量和节省投资及缩短了工期。

    By applying the P-switch , a 64 kbit / s DXC device , numbers of PCM equipment can be reduced enormously , saving the investment and shortening the building time .