引子渡水电站

  • 网络yinzidu hydropower station
引子渡水电站引子渡水电站
  1. 引子渡水电站为引水式地面厂房,厂区布置紧凑,无施工干扰。

    Yinzidu hydropower station has diversion-type ground powerhouse with the characteristics of compact layout and not disturbed by construction .

  2. 介绍X-射线衍射技术检测残余应力方法在贵州引子渡水电站钢岔管上的应用;

    This article introduces the method of X-radial diffraction technology detecting residual stress of steel bifurcated pipe of Yinzidu hydropower station .

  3. 本文重点介绍了引子渡水电站岔管下料、卷材、预拼装、运输、焊接、安装的详细施工过程。

    This paper mainly intro-duces the detailed working procedure for material cutting , bending , pre-making-up , transporting , welding and installing .

  4. 引子渡水电站枢纽工程由混凝土面板堆石坝、左岸溢洪道、发电引水隧洞、厂房等水工建筑物组成。

    The pivot of Yinzidu Hydropower Station consists of a concrete face rockfill dam , a spillway on the left band , conduit tunnels , and a powerhouse .