换料

huàn liào
  • refuelling;reloading;change material
换料换料
换料[huàn liào]
  1. 介绍了NHR-10组件内钆可燃毒物配置、堆芯燃料组件布置和换料方案的改进设计。

    This paper introduces the improved NHR 10 core design which includes the arrangement of the gadolinium burnable poison ( BP ), the fuel assembly arrangement and the fuel assembly reloading scheme .

  2. 核供热堆换料优化设计研究

    Study of reloading optimization design for nuclear heating reactors

  3. 用于CANDU堆换料方案快速评价的线性敏感矩阵方法

    Development of linear sensitivity matrix method for fast evaluation of CANDU refuelling schemes

  4. 利用中子学计算程序对换料堆芯正常运行工况(一类工况或工况I)和中等频率事故工况(二类工况或工况II)中可能的堆芯功率分布进行模拟。

    The radial and axial power distributions of normal operation ( category I or condition I ) and abnormal operation ( category II or condition II ) are simulated by using neutronics calculation code .

  5. 而且现在的凹板印刷又要求具有高速、全自动换料的特点,这又增加了张力控制的难度,传统的PI控制满足不了控制的要求,必须对其进行改造。

    Tension control becomes more difficult because modern gravure press machine possessing high speed and auto material-exchanging . The traditional PI control can not satisfy the requirements of control precision and system stability .

  6. 实例分析验证了该方法的有效性;4分析研究了粗糙集理论在CANDU反应堆换料管理工作的应用。

    The experiment showed that the algorithm was valid . 4 The application of Rough Set Theory in fuel management of CANDU reactor was analyzed and researched .

  7. 自某电站投入运行以来,当使用PO管从换料水池向BA管传水时,D2泵下游出口管线振动和噪声相当高,导致该泵和相关管线损坏。

    Since some power station has been putting into operation , so high the pipeline vibration and noise of the pump backward position exist when the spreading water from the changing pond to BA with PO , then this pump and relevant pipeline are damaged .

  8. 对一个典型压水堆堆芯在IBM-4341计算机上进行了计算,得到预期效果,计算所用机时较省(对1/8堆芯布置,计算3个换料周期约用9分钟CPU时间)。

    Some calculations were done for a typical PWR core on an IBM-4341 computer , The satisfactory results were obtained at reasonable low computational costs . It spent nearly 9 mins CPU time for 3 fuel cycles with a 1 / 8 core configuration .

  9. HTR-10-MW高温气冷实验堆换料方式的研究

    The study on the shuffling scheme in HTR-10 MW test module

  10. 大亚湾核电站18个月换料对流体系统的影响分析和论证

    Fluid Systems Analysis and Verification for GNPS 18-Months Fuel Cycles

  11. 追求技术创新创世界一流水平&记大亚湾核电运营管理有限公司18个月换料项目工作

    Pursues the technique innovation , create top-grade level in world

  12. 换料报告审评方法及效果

    Method and Effects of the Review on Refuelling Outage Report

  13. 快堆过渡循环换料方案的优化设计

    Optimization Design of Refueling Strategy for Fast Reactor Transition Cycles

  14. 遗传算法在压水堆核电厂低泄漏换料堆芯装载方案优化中的应用

    Low-leakage Loading Pattern Optimization for PWR NPP Reload Core Using Genetic Algorithms

  15. 大亚湾核电站堆芯换料设计

    In-Core Reload Design for Daya Bay Nuclear Power Station

  16. 其工作量大大延长了换料设计的周期。

    Thus it delayed the cycle of reload design .

  17. 混合遗传算法在压水堆换料优化中的应用

    New Hybrid Optimization Method and Its Application to Pressurized Water Reactors Reloading Optimization

  18. 在压水堆核电站换料的过程中存在燃料棒破损的可能。

    There exists probability of fuel assembly damage in PWR during refueling period .

  19. 大亚湾核电站18个月换料非失水事故分析

    GNPS 18-Months Fuel Cycles Non - LOCA Accident Analyses

  20. 换料操作必须遥控进行,并且不需要人为的直接干预。

    Refuelling must be done remotely without direct intervention .

  21. 最后比较了由该系统生成的换料程序和人工编写的程序。

    Finally , a comparison of computerized and manned-programmed refueling plans is given .

  22. 在核电站堆芯换料管理系统上的应用,验证了该方法的有效性。

    The proposed methods were validated by the applications in nuclear station MIS .

  23. 外层燃料内移换料方式供者细胞脾内移植诱导小鼠气管移植耐受

    Induction of Tolerance to Murine Tracheal Allograft by Intrasplenic Transplantation of Donor Cells

  24. 松开螺丝,将燃料换料的存储空间补充制动液。

    Loosen the screw , will fuel refueling storage space added the brake fluid .

  25. 遗传算法及其应用于堆芯换料优化问题的特性研究

    Study on Characteristics of Genetic Algorithms and Its Application to Optimize Reloading Pattern Problem

  26. 两台机组的首次装料设计和首次换料设计由法马通承担。第3循环大亚湾核电站与国内换料设计单位一起致力于换料设计自主化,井开始与法马通背靠背的换料堆芯设计。

    The two initial core design and first reload design were done by Framatome .

  27. 压水堆多循环换料设计优化方法研究

    Algorithm research on PWR multi-cycle refueling design optimization

  28. 大亚湾核电站18个月换料堆芯热工水力设计

    GNPS 18-Months Fuel Cycles Core Thermal Hydraulic Design

  29. 大亚湾核电站18个月换料工程及其项目管理

    18-Months Fuel Cycle Engineering and Its Project Management of the Daya Bay Nuclear Power Station

  30. 岭澳核电站二期18个月换料燃料管理研究

    Fuel Management Study on 18-Months Fuel Cycle for Ling ' ao Phase-II Nuclear Power Station